Ring Lock Scaffolding System for High-rise Constructions

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

 

Ring-lock scaffolding consists of cup-lock connector,post,cross bar,diagonal brace,base and top brace.Safe and convenient to operation,fast to assemble and dismantle,widely used in scaffolding construction,such as formwork scaffold and fitment construction.

 

Specifications:

 

 materialQ235,Q345

 tube size48.3*3.2mm 

 surfacinghot-dip galvanized

 the usual size0.5-3m

 

Main Features of the Ring Lock Scaffolding

 

  - Using less pipes

 - Easy to install

 - It can be used again and again for nearly 20years 

 - Easy to storage and transportation 

 - High degree of standardization

 - Easy and quick erection

 - Excellent stability and bearing capacity



Why choose us?

 professional scaffolding manufacturer

 timely delivery

 authorty certification

 one-stop technical support

 decades of years' experience

 strict quality managemen


Ring Lock Scaffolding Images


Ring Lock Scaffolding System for High-rise Constructions

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many kinds of wheel buckle scaffolding and adjustable wire base and support?
3, the vertical and horizontal spacing of the vertical pole, the horizontal and vertical, the step distance of the bridge should be approved by the erection scheme, is approved by the calculation;4. The vertical and horizontal spacing of the vertical rod can be arranged by 90cm * 90cm, which can meet the requirements of JGJ162-2008 specification and GB50666-2011 specification;
Q:What is the size of the bowl buckle scaffold?
Bowl buckle type scaffold poleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004
Q:Does the Scaffold Ear Piercing Show?
you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
Q:I have a rather unattractive lump on my scaffold piercing, and i have no idea what to do with it?
ive got that too on my ear i also had it when my i had my belly peirced it went away after a while
Q:why is scaffolding important?
Scaffolding is a support structure in the early days of learning. Think of it in the same way as scaffolding for a building - in the early days, while things are being constructed, the scaffolding is needed to make sure the structure is strong, but once the building is strong enough to stand on its own the scaffolding can be removed, one piece at a time. It's the same with scaffolding for learning - once the child is strong enough in it's grasp of something, the props can be removed one at a time.
Q:what does the scaffold symbolize in the scarlet letter?
This Site Might Help You. RE: what does the scaffold symbolize in the scarlet letter? i'm writting an essay about symbols in the scarlet letter. can you tell me what the scaffold symbolizes or any other symbols. thanks
Q:I got my scaffold piercing 4 weeks ago, but is it infected?
It may be getting infected, I would just put alchoal on a Q-tip and rub it on at night and in the morning. Good luck (:
Q:Specification for bowl scaffold support rod top length of not more than 30cm
JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications page 6.96 forty-first
Q:How to weigh the weight per meter of wrist button scaffold
The longest component of the scaffold 3130MTM, the most reconstruction pieces 40.53KG.
Q:What are the requirements for the foundation and foundation treatment of bowl - shaped steel pipe scaffolding
In fact, the construction of high-rise building scaffolding over a certain height, should be carried out economic comparison, otherwise, the height of a one-time erection is too high, the cost will be high.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range