Ring-lock Scaffolding,Best Performance,Nice Maintenance,Great Prices

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Main Description of Ring-lock Scaffolding:

 

  • Name: Ring Lock Scaffolding.

  • Category: Scaffolding system.

  • Material: Steel (Q235/Q345).

  • Size: D48.3*500/1000/1500/2000/2500/3000/4000.

  • Surface: Electro Galvanized/Self Color/Painted/HDG.

  • Component: Standard, base collar, ledger, diagonal brace end, ledger end, ring, connector, guard rail, etc.

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.

  • Advantage:  Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle.

  • Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

 

 

2. Main Futures of Ring-lock Scaffolding

 

  • Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000,  500mm etc.

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Ring: Made from cast-steel or pressed steel.

  • Ledger connection-peg: made from cast-steel.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 Ring-lock Scaffolding,Best Performance,Nice Maintenance,Great Prices

 

Ring-lock Scaffolding,Best Performance,Nice Maintenance,Great Prices

 

 

4. FAQ

 

  • How to guarantee the quality of the products:

     

    We have established the international advanced quality management system,every link from raw material to final product   we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

 

  • How long can we receive the product after purchase?

     

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific   

time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A worker on a scaffolding 85ft above the ground needs to lift a 440lb bucket of cement from the ground to?
Integral 0 to 85 [440 +(85-x)]x dx
Q:Industrial piercing(scaffold)?
Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
Q:Does it matter what size your ear is when you get an industrial/scaffolding piercing?
does not matter
Q:How do I know if I'm anatomically suited to get an industrial/scaffold ear piercing?
goto the piercing shop and ask?
Q:Scaffold/Industrial piercing?
it will eventually go down. industrials can take up to a year to heal. don't worry about it.
Q:What is the size of the bowl buckle scaffold?
Bowl buckle type scaffold poleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:Whats a scaffold piercing?
upper ear...duhhhh
Q:Bowl buckle type steel pipe scaffold and fastener type scaffolding comparison, which is good stability
Check the overall stability of the bowl - shaped steel pipe scaffolding, the current test is not enough (still in progress)
Q:What are the components of the bowl buckle joint in the bowl buckle scaffold
Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range