Reinforced Waterproofing and Vapor Barrier Membrane

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2000 m²
Supply Capability:
500000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PE Waterproofing and Vapor Barrier Membrane


Introduction:

Vapor insulation membrane is a roof membrane with three-layers, which is specially designed for application on ventilated pitched roofing, can be used under bituminous membrane as a extra protection for the attic insulation. It includes PET/PP non-woven fabric layer, PE/PP woven layer and aluminum foil layer. The three-layers structure ensure extreme resistance to tearing. Furthermore, the special stabilization additives ensure 3-month resistance to UV radiation.


Specification:


Chemical Composition

PP & PE, Aluminum Foil, Woven Fabric

Roll Size

1.5meter*50meter

Density:

60gsm~130gsm

Tensile Strength

MD:150N/50mm; CMD:115N/50mm

Waterproofing Rate

W1

Vapor Resistant Rate

6.9g/m2 ▪ 24h

Aging rate under hot circumstance

(90*168h)

MD:90%; CMD:100%


Typical Installation:


Reinforced Waterproofing and Vapor Barrier Membrane


Typical Application:

Reinforced Waterproofing and Vapor Barrier Membrane

Reinforced Waterproofing and Vapor Barrier Membrane


FAQ:

1.       Where is your factory located in?

Our factory is located in Jiangsu province, close to Shanghai.

2.       Have you ever been export?

Yes, our product has been exported to many countries.

3.       Can we get samples?

Yes, we are free for samples, what you need to assume is freight charge.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the car material so that the car can be waterproof, in the rain will not leak in?
 C. metal technology and other: metal technology refers to the aluminum plate and other metal plate through the machine to suppress the concavity and convex surface, and then made of metal paint color, and finally after grinding, drawing and other production of the car stickers (car standard); Area can not be too large, can only be used for a small range of iconic car stickers.
Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
Third, from the indoor water leakage area for waterproof maintenance.
Q:Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ​​leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
Q:Hello, roof with SBS waterproof material bulk density is how much?
SBS Styrene-based thermoplastic elastomer is the largest yield (more than 70%) of SBCs, the lowest cost and wider application. It is a triblock copolymer with styrene and butadiene as monomer. Plastic and rubber properties, known as the "third generation of synthetic rubber".
Q:Waterproof mortar expensive or dry mortar expensive
Dry mortar is usually called hydraulic cement mixed mortar, refers to the dry sieve treatment of aggregate (such as quartz sand), inorganic cementing materials (such as cement) and additives (such as polymers) and so on a certain proportion of physical mixing Into a granular or powdered, in the form of bags or bulk transported to the site, add water, mix directly after the use of materials.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
Q:What is the difference between finished mortar and cement mortar?
Finished mortar and cement mortar difference: Cement mortar is the synthesis of three main materials, cement, sand and water, and mixed mortar is the synthesis of four major materials, cement, sand, lime and water.
Q:Home improvement waterproofing problem
2, the ground waterproof layer generally turned 20 cm. Use the shower parts generally do more than 2.2 meters.
Q:How to do waterproof bathroom, construction process is what
Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
5, in strict accordance with the underground waterproofing procedures for concrete construction and construction of waterproofing membrane, a reasonable set of settlement and construction joints, to reduce the structure of the crack; for the structure of stubble, settlement joints, construction joints to take the necessary waterproof measures (additional Waterproof layer or set the water-stop plate, water strips, etc.). 6, to strengthen the hidden acceptance, the good quality off.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range