PUMPING CYLINDER(SCHWING) I.D.:DN230 CR. THICKNESS :0.25MM-0.3MM LENGTH:2215MM

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Concrete Pump Delivery Cylinder  DN230*2215 normally made by steel material No. C45. according to customer’s requests, and also package in bundles or nude packing directly put into container.

Scope of Application of the Cylinders

The Pump Delivery Cylinder   DN230*2215 is a Cylinder pumping for combined use with other concrete pumps parts in concrete pumping operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This Cylinder Cylinder   DN230*2215can only be used in concrete pump construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.

Specifications:

Concrete Pump Delivery Cylinder DN180*2000

1. Capacity: 60,000~80,000cbm 
2. Size: DN180, DN200, DN230.DN250 

3. Material: C45

4. quenching and tempering to improve the hardness to HB241-280

5. inner wall chrome thickness is 0.25-0.30mm, hardness HV820-900. 

6. Brand: SCHWING, PM, SANY, KYOKUTO, CIFA

7. Capacity: 60,000~80,000cbm

 

Product Advantages:

OKorder's Cylinders   DN230*2215Channels are durable, strong, and safety.

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (10-20 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

 

FAQ:

 

Q1: How long about delivery time about   DN230*2215?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our Cylinders DN180*2000?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically10 to 30 workdays.

Q4: If we can produce some Cylinders   DN230*2215according to customers request?

A4: Yes, we can produce Cylinders   DN230*2215according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world.

 

PUMPING CYLINDER(SCHWING) I.D.:DN230  CR. THICKNESS :0.25MM-0.3MM     LENGTH:2215MM

PUMPING CYLINDER(SCHWING) I.D.:DN230  CR. THICKNESS :0.25MM-0.3MM     LENGTH:2215MM

PUMPING CYLINDER(SCHWING) I.D.:DN230  CR. THICKNESS :0.25MM-0.3MM     LENGTH:2215MM

PUMPING CYLINDER(SCHWING) I.D.:DN230  CR. THICKNESS :0.25MM-0.3MM     LENGTH:2215MM


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How much is the pump for a month?
Excluding oil costs, each side of the soil about 0.5 oil (Sany E series pump), the 7000 sides will be about 3500L oil X7.33=3 yuan, remove the wages of workers (4 per person 5000=2 million)
Q:How to diagnose the blockage in the inlet of concrete pump?
The feed port is blocked and the pump operation and hydraulic system are normal, with no abnormal sound and vibration. The hopper has larger aggregate or agglomerates and is stuck or arched at the feed port
Q:How to calculate the power of concrete pump motor?
Of course, the motor power is large, the transmission speed is fast
Q:What is the second generation pumping technology of concrete pump?
Concrete pump, S pipe distribution without PLC electrical components to participate in, the failure rate is lower, more reliable control, product life has greatly improved
Q:What is the washing process of the concrete pump pipe?
Open the first section of the reducing pipe and the discharge gate, and thoroughly remove the remaining concrete in the hopper, the distributing valve box and the reducing pipe.
Q:How can the concrete pump be installed and used?
Concrete pump should be placed on a firm and flat ground, with legs down and the body stable
Q:How to calculate the power of concrete pump motor
The amount of concrete pump used in the construction business can be calculated according to the concrete pouring amount, the actual transport capacity of the single machine and the construction operation time. For those concrete pumping projects with a large amount of disposable concrete, besides the calculation and determination, there should be a certain reserve. In addition, an annual output of 10~15 million M3 concrete mixing plant, 2~3 equipment needs to be equipped with concrete pump vehicles
Q:What are the causes of pipe blockage in concrete pump?
The concrete mixture ratio of adverse pressure gradient in the relatively large, water will be through the aggregate gap penetration, the aggregate coalescence caused by plugging occurred in the pipeline, and the pipeline bending diameter hose is arranged in the middle; in addition, concrete water cement ratio is too large to cause the separation of mortar and aggregate segregation, and plugging
Q:What are the specifications for concrete delivery pumps?
The pressure of each safety valve of the hydraulic system of concrete pump shall comply with the requirements of the manual, and the user shall not adjust the change
Q:Why would the plugging concrete pump pipe
When pumping, the choice of speed is critical, operators can not blindly map fast, sometimes more haste, less speed. When pumping for the first time, due to the large resistance of the pipeline, the pump should be pumped at low speed. After the pump is normal, the pump speed can be increased properly

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range