Concrete Pump Spare Parts RUBBER SEAL DN125

Ref Price:
$0.50 - 6.00 / pc
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
10 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Product Name:   RUBBER SEAL DN125

1.    Specification of   RUBBER SEAL DN125

Dimensions: 5" 6" DN125 DN150 

Notes: total series of concrete pump clamp for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc) available from us.

2.  Application of Concrete Pump Bend DN125

  RUBBER SEAL DN125  widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery pipe connection.

Our concrete pump bends have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

Aiming at the largest concrete pump parts manufacturer, and reliable, professional supplier in China, we can supply concrete pump elbows, delivery pipes, casting or forging couplings, end rubber hoses, rubber pistons, tungsten wear plates, delivery cylinders, and other hydraulic parts, one stop service for your concrete pump parts and accessory business.

3.  Package and Delivery of   RUBBER SEAL DN125

Every 500pcsRUBBER SEAL DN125 put in one seaworthy wooden box, and 20 boxes in one 20feet container.

 

FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some RUBBER SEAL DN125 according to customers request?

A4: Yes, we can produce RUBBER SEAL DN125 according to the difference country situations and different concrete  pump to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:We have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 

Images: 

 

Concrete Pump Spare Parts  RUBBER SEAL DN125

Concrete Pump Spare Parts  RUBBER SEAL DN125

Concrete Pump Spare Parts  RUBBER SEAL DN125

Concrete Pump Spare Parts  RUBBER SEAL DN125

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to operate the concrete pump?
Pumping equipment parking brake and lock brake should be used at the same time, the tire should be wedge tight, water supply should be normal, and the tank should be filled with clean water, the hopper should be no debris, the lubrication points should be lubricated properly
Q:How to calculate the power of concrete pump motor
The amount of concrete pump used in the construction business can be calculated according to the concrete pouring amount, the actual transport capacity of the single machine and the construction operation time. For those concrete pumping projects with a large amount of disposable concrete, besides the calculation and determination, there should be a certain reserve. In addition, an annual output of 10~15 million M3 concrete mixing plant, 2~3 equipment needs to be equipped with concrete pump vehicles
Q:Is the main pump of the concrete pump electric control or hydraulic control?
The main pump behind the oil pump to provide the size of the oil with the greater the current the higher the higher the higher the displacement,
Q:What are the layout requirements of concrete pump for building engineering?
The setting of concrete pump should be steady and firm, with heavy vehicle running condition
Q:How much is the pump for a month?
Remove the pump car monthly fuel maintenance consumption (about 10 thousand to 5000), calculate the monthly one of the clay, probably earn about 14 to 150 thousand net!
Q:How to diagnose the blockage in the inlet of concrete pump?
The feed port is blocked and the pump operation and hydraulic system are normal, with no abnormal sound and vibration. The hopper has larger aggregate or agglomerates and is stuck or arched at the feed port
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
The length of day pump 36-62m, the efficiency has little effect, regular work is generally 30-40 cubic / hour
Q:Why would the plugging concrete pump pipe
Pump operator in pumping construction should concentrate, always pay attention to pumping pressure meter readings, once found that the pressure gauge reading suddenly increased, should immediately anti pump 2-3 stroke, and then pump, pipe can be excluded
Q:What kind of concrete pump truck?
But the drawback is that the delivery speed is slow. Delivery height is better than vehicular pump. Among them, the more moderate is the car pump. But the advantage is that the arm pump can do, it can do, that is, when construction, need to install the pump ahead of time, relatively troublesome. But the relative pump speed and delivery height are higher
Q:Which is the best home made concrete pump car?
The second is heavy Futian Fortaleza, Xiangjian, Xugong, honedeli, the price is high, basically there is no big problem

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range