One Ton Capacity Building Hoist

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
40 units unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Building hoist
1, Two cage
2, maximum capacity:1Ton/cage
3, Middle speed:0-60m/min
4, Main part welded by robot

The Construction Hoist is set up with frequency conversion and twin cages. Every cage has two suits of independent driving mechanism.With the technology of frequency conversion the construction hoist driven by rack and pinion can speed up and slow down steadily. It has features such as:
1. Starting and braking are steady with no impact.
2. The lifting speed can be controlled.
3. Starting current is lower than rated current.
4. The mechanical wear and tear is reduced evidently.
5. Power saves efficiently.

The main technical parameters of SC100/100 construction hoist ate listed as follows:

1. Lifting capacity: 2x1000kg

2. Lifting Speed: 33m/min  or 60m/min with frequency inverter(Toshiba)

3. Rated Power: 2-2x11kw  or 2-2x15kw

4. Mast Section Size: 650x650x1508mm, double rack,  Painted or Galvanized optional

5. Delivery time: 20-25 days.


We can provide tailored design, backing on the strong technical strength of China Academy of Building Research.

Construction lift with Interver:

CharacteristicsModelRated LoadingLifting SpeedMotor Power
 
 
Double Cabin
 
 
Low-speed
SC200/200D 2 × 2000kg0-36m/min2 × (3 × 11kw)  2 × (2 × 13kw)
2 ×(2 × 15kw)   
SC100/100D 2 × 1000kg0-36m/min2 × (2 × 11kw)
 
Mid-speed
SC200/200Z 2 × 2000kg0-60m/min2 × (3 × 15kw)
SC100/100Z 2 × 1000kg0-60m/min2 × (2 × 15kw)
 
Single 
Cabin
 
Low-speed
SC200D    2000kg0-36m/min3 × 11kw
2× 13kw
2× 15kw
SC100D    1000kg0-36m/min2 × 11kw
 
Mid-speed
SC200Z    2000kg0-60m/min3× 15kw
SC100Z    1000kg0-60m/min2 × 15kw




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Excuse me: what is the meaning of heavy weight in the construction elevator?
This is very nice! Learn more! Thank you for your dedication...
Q:Are there any good signs in the construction elevator door
It is forbidden to climb, construction lift operation procedure, limited number of passengers, no power cuts
Q:The construction elevator can only go up can't come down what happened
Look at the contactor connectionThe drop contactor does not absorb
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
It should be the ground pump, the center is the tower crane, the construction face is the concrete pump of the cloth machine to the construction method. The advanced cloth machine is the arm bracket of the pump car, can operate with the remote control, is as convenient as the pump car.
Q:The construction elevator relies on what to carry heavy, static hour force point where
The driver of the elevator ladder cage is driven by two or three worm gear reducers, which carry heavy lifting parts, and gravity is carried by the rack. At rest, the force point is in the meshing of the gear and rack. It is the main balance between the rewire rope and the ladder cage and the relative motion. For heavy can improve dynamic performance, a heavy on the ladder cage running more smoothly, when a fall, fall of heavy can slow down the ladder cage speed, it should be said that safety performance is better.
Q:What is the main function of elevator motherboard?
It's collecting the peripheral signals and testing and assigning the output instructions,
Q:The safety officer shall be responsible for the work of the construction elevator
(1) the use of dual-use functions of the construction elevator, the installation and removal of the professional personnel issued by the competent department of construction administration shall be undertaken by the professional personnel. The personnel who have passed the training, qualified for the examination and obtained the certificate of the post shall be operated and repaired. (2) the capacity of the concrete base culture cooperation should not be less than 150kPa, the tolerance of 10mm and the drainage facility should be allowed. The distance between the guide bracket of the elevator and the wall of the building should be suitable, and the smoothness should be stable. (3) the lifter is used to control two directions, and the vertical control is 0.05%. Each floor shall have a platform, a passage, a fence and a protective door. No obstacles can be found. (4) the elevator that is installed in a dark place, and the passage shall be illuminated and a floor display lamp and floor number; A closed barrier should be set up in the well. The elevator shall be subject to acceptance by the technical director and the relevant departments, and shall be tested by the crash and shall be used in the rear. (5) in the use of or during the use of the elevators, the manufacturer or designated unit shall conduct the debugging and maintenance and verification. The lifter should undergo a fall test every three months and the fall test should be adjusted when the fall test exceeds 1.2 m. Every time it falls, the receiver should be repaired once.
Q:What's going on with the decline in construction lift
Check whether the brake contactor and normal, contactor adhesion conditions will decline, brake pads have the problem not only rise to fall, fall in the same slide. If the contactor is ok, you can see that there is a groove on the brake pad, and it is only replaced if the brake is not damaged, such as cracking. If it's a frequency conversion elevator, if you're down, see if the converter has any fault code, if you have a consulting manufacturer. The assumption is that the anchuan frequency converter, which may be a real SE failure, means that the timing error is not normal for controlling the contact of the receiver.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
Layer should be made from steel door frame, Shanghai silk screen, and is equipped with solid and reliable locking device, elevator door layer, the process should be hanging cage crew operations, shall not be under the direct control of elevator lift cage's movement. The net height should not be lower than 1.80 m, and the width of the door should not be greater than 120mm.
Q:The staff on the construction platform shall not exceed the number of people
There is no specific specification that should be more platform-specific

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range