New Design Prefab House With PU Sandwich Panel For South Project

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

New design prefab house with PU sandwich panel for South project

 

 

Technology brief instroduction

    Prefa house is fast-installation and convenient house.Sandwich panel and steel structure are the born structure material for prefabricated house.According to prefabricated house size,the house panel and steel structure can be changed relatively. Also, the prefabricated house can be designed as family house,office,hotel,store,camp house,hospital,etc.

     The goods for prefabricated house can be easily package and transport.Normally, 2 sets of 60sqms prefabricated house can be loaded into one 40ft container. 

Usually, 6 workers can complete one set within 3days


Specifications

1.Good insulation 
2.Living comfortable 
3.Low cost 
4.Installment fast and easily

New Design Prefab House With PU Sandwich Panel For South Project

New Design Prefab House With PU Sandwich Panel For South Project

 

 

Technical Characters

 

                                                Light steel structure villa specification

Key Features

Item Title

Materials Description

House body

Main structure

Light Steel Structure, steel column, Structure board

Exterior wall decoration

90 steel stud, glass wool, 10mm calcium silicate board, moisture-proof film, 19*50 steel stud, fiber cement board, exterior wall water-proof

Roof/Cornice

Roof: Single-layer bituminized tiles, 3mm SBS water-proof rolling material, 15mm OSB board
Cornice:75mm steel stud, calcium silicate board, putty paint

Rain carrying system

PVC rain carrying system

Doors and windows

Security door, paint-free door, glass door, plastic steel window, artificial marble

Finishing

Interior wall decoration

Ceiling grid, second floor 75*2 glass wool, first floor 75mm glass wool, waterproof moisture-proof membrane, 9.5mm plaster board, putty paint

Interior ceiling

Fire proof gypsum board, putty and paint

Water and electricity pipes

Water supply PPR pipe, drainage PVC pipe
Switch socket panel, lamp

Indoor ground

Floor and accessories, kitchen and washing room tile

Other materials

Closet, washing basin, sink, shower

Installation

To install 200m2 house needs only 45 days by 6 professional workers

Loading quantity

One 40' container can load 140 m2

Wind load

130km/h

Anti-seismic grade

9 degree

Life span

Around 70 years

Remarks

This specification is for the reference, if there are differences between actual condition, the adjusting is according to the actual condition.

 

 

FAQ

 

1.    Q: How much is this house?

A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.

2.    Q: Do you do the turnkey project?

A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.

3.    Q: How long will your house stay for use?

A: Our light steel prefab house can be used for about 70 years.

4.    Q: How long is the erection time of one house?

A: for example one set of 200sqm house, 8 workers will install it within 45 days.

5.    Q: Can you do the electricity,plumbing and heater?

AThe local site works had better to be done by the customers.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the number of years of row of villas?
you can view your land certificate, the above will be explained.
Q:Buy second-hand villa need to pay attention to what?
but not the same landscape you dig the "silver" are also different.
Q:What is the villa district management model
each post set. Each department, each post name is for the interests of the owners, are in order to more efficient
Q:What are the taxes to sell the villa?
Of course, the villa is certainly a non-ordinary residential, if the landlord is the transaction price, you only pay the total 3% of the deed tax on the line,
Q:What is a stacked villa?
Give a simple example, just like building blocks, layer by layer of the stack, each layer for a unit.
Q:What is the general civil villa beam specifications?
Liang is generally used for the conversion between the floor, it depends on your structure above the beam is what to use
Q:What is the most important thing to design a villa?
Due to the limitations of architectural design, often the villa area utilization rate is not equal, the use of frequent space sometimes the area will be cramped
Q:How about introducing a villa?
The villa is a three-storey single-family house with a basement, with an indoor garage. Like a lot of villas, villas
Q:What does the quadruple villa mean?
Villa, that is, wild, a low-level townhouse, in the suburbs or scenic area for the construction of the garden for the rest of the garden.
Q:Is the area of the villa terrace not included in the building area of the villa?
The size of the villa terrace is not included in the villa's building area.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range