Relief Houses
- Loading Port:
- Main port,China
- Payment Terms:
- TT or LC
- Min Order Qty:
- 140m2 m²
- Supply Capability:
- 10million m2/year m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications of Relief Houses
Relief Houses are divided into the temporary housing and the aided-built or reconstructed housing, whichmainly refer to the post-disaster buildings and temporary housings in urgent demand, such as, housing, hospitals, classrooms, activity rooms and schools.
Housing and Building. All the components of the Housing and Building are prefabricated in the manner of factory standardized production, and then assembled on-site, by which the construction mode of component prefabrication and on-site assembly can be realized. Characterized by no wet operation, short construction period, reduction of noise, dust and waste, small impact by climate conditions, easy disassembly and recycling, it is consistent with the requirements on energy conservation and environmental protection of green buildings
Technology Systems
Light Steel Frame System: This system is suitable for 1-3 storeys building
Formed by the dense light steel studs and compound envelop, and supported by professional software CAD and CAM, and by intelligent equipment, this system is with superior physical qualities.
Features & Advantages of Relief Houses
1. Seismic and Wind Resistance
Withstand the shock of 9 on the Richter scale.
The dense light gauge steel and column are connected in flexible method with screws and bolts, which can absorb the energy of earthquake. There are fittings between foundation and wall, which are resistant to pull out and shear. The total weight of the house is light, which is only 1/6 of traditional concrete houses. Therefore it has better anti-seismic performance.
Can endure typhoon of 12 levels
There are special fittings among roof, floor, wall and basement. The strong connection can help resist typhoon of 12 levels.
2. Roof Load-bearing and Fireproof
The roof can withstand 1500mm thickness snow.
The structure can be designed according to climate requirements.
Low-rise building fire resistance meet 2.5h (Grade Ⅱ) design standard.
High-rise building fire resistance meet 3h (Grade Ⅰ) design standard.
Wall and floor slab use special technology which can meet 3h refractory limit.
3. Thermal Insulation
The advanced exterior overall thermal insulation meets the updated state energy-saving standards for buildings. It refrains from the cold and thermal bridges phenomenon, and keeps buildings away from damages such as dampness, distortion, mildew and corrosion.
The unique heat reflection and ventilation layer design can make better insulation effects. Temperature can be reduced by five to eight degrees.
4. Sound Insulation
Improved technology on sound insulation and shock absorption meet the state building standards for sound insulation. Special methods are performed, especially towards the audio frequency ranging from 250 to 1000 Hz which is the most sensitive to ears, in order to create a quiet and comfortable living environment.
5. Moisture-proof and Ventilation
There is a gap between wall and roof truss, so the air can flow inside.
There is a one-way ventilation layer in the composite wall, which is able to make the wall ‘breathing’. This means moisture can be reduced inside of the door.
6. Durable
90 years structure safety guarantee
Special coating technology enables the structural materials to have the self-restoration function to prevent rust and corrosion.
Envelope materials using new lightweight building materials to achieve fire resistant,anti-corrosion and anti-moth.
7. Energy Efficient and Environmental Protection
Energy Saving:65% -90% energy reduction.
Water Saving :The dry construction consumes 10% of water used in traditional construction.
Material Saving :90% of used materials are recycled.
Land Saving :The inside usable area increases 10%.
Environment Protection:Pollution–free construction system.
Operation Capability of Relief Houses
Design: Grade A building design certificate
Production: The annual production capacity is 10 million square meters
CAD and CAM software provides the safeguard for the factory mass production and high precision of constructional element, for the convenient installation,all of which improve production efficiency.
Construction
Dozens of experienced project teams, hundreds technical guidance engineers
15 days to complete a 100square meters residence.
60 days to complete a 200square meters villa.
100 days to complete a 10000square meters public building.
- Q:What is the floor area of the villa?
- The floor area rate is generally prescribed by the government.Independent villa for 0.2 to 0.5
- Q:What are the taxes to sell the villa?
- Government tax regardless of villas or apartments, only divided into ordinary residential, non-ordinary residential and moving rooms.
- Q:What is the thickness of the villa's floor and the maximum load it can bear?
- All floors will never exceed the thickness of the drawings marked, so your floor thickness can not exceed 120 mm
- Q:What is the villa residential property management content?
- engineering maintenance services: owners of the repair service should be implemented 365 days 24 hours repair system
- Q:What is a villa class real estate development project?
- In the suburbs or scenic areas for the construction of a low-level row for the sale of residential real estate projects known as the villa class real estate development projects.
- Q:How about introducing a villa?
- Ministry of Land and Resources on the definition of the villa: refers to the unique single-door, two to three-storey form; covers an area of ??considerable, floor area rate is very low.
- Q:Buy second-hand villa need to pay attention to what?
- Although most of the villas are used as "second home", but also must pay attention to the district's traffic, life support, property management and other details
- Q:Villa room function how to divide the most appropriate?
- storage room, factory, tea room, recreation room, recreation area, fitness area
- Q:What kind of villa generally?
- a row of two to four layers together, each several units share the external walls, a unified graphic design and independent portal. Townhouse Villa is currently one of the most affordable villas taking the form.
- Q:What is the height of the villa house?
- Size: Due to the reasons for the apartment and the height of the floor, so this type of door, the height should be more than the usual standard (2100 mm)
1. Manufacturer Overview |
|
---|---|
Location | Beijing,China |
Year Established | 2008 |
Annual Output Value | Above US$1.5 Billion |
Main Markets | North America, East Europe, Middle East, South Asian, South America, South Pacific Islands and African countries |
Company Certifications | ISO9001:2008;ISO14001:2004 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | TIANJIN PORT |
Export Percentage | 40% |
No.of Employees in Trade Department | 40 People |
Language Spoken: | English;Chinese |
b)Factory Information | |
Factory Size: | Above 150,000 square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average, High |
Send your message to us
Relief Houses
- Loading Port:
- Main port,China
- Payment Terms:
- TT or LC
- Min Order Qty:
- 140m2 m²
- Supply Capability:
- 10million m2/year m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords