luxury modern light steel villa 8#

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000㎡ m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

This product belongs to Ligth Steel Frame Structure.

This structure is formed by the dense light steel studs and compound envelop and  with all kinds of supprior physical qualities.

Advantages:

1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle

6. Thermal Insulation
7. Seismic and wind resistance
8. Roof Load-bearing

Packing:

light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the electrothermal film?
The precondition for installation of electrothermal film: 1) Construction drawings and other technical documents are complete. 2) The construction design or construction scheme has been determined and technical disclosure is completed. 3) Materials, tools and construction manpower which meet the requirements of construction are ready. 4) The plastering of the internal walls has been completed and the ground engineering has ended. Other invisible pipeline project has ended. 5) The floor is clean and has no sundries on it. 6) Distribution box is in place. The project of power supply and other branch circuits has ended. The installation process of the intelligent electrothermal film (floor) heating system is as follows: (1) Clean the floor and install the extruded board; (2) Install the electrothermal film; (3) Connect T-cables; (4) Buckle extruded boards; (5) Test the multimeter; (6) Install the temperature sensing probe; (7) Install the temperature controller; (8) Electrify and test.
Q:What should pay attention to in the construction of geomembrane?
The best method is using buried laying. During construction, first of all, level out the base surface with smaller sand or clay, and then pave geomembrane. Don't stretch geomembrane too tightly, both ends embedded in the soil section is corrugated and finally pave a layer of about 10cm transition layer with fine sand or clay on paved geomembrane. Block 20-30cm stone (or concrete precast block) as scour prevention layer. It is better to avoid the stones to hit on geomembrane, and it is better to carry on the construction of the protective layer while pavement of geomembrane.
Q:Which one is better, oil heater or electrothermal film?
Both oil heater and electrothermal film are pure resistance circuit, using resistance to heat things, thus their efficiency is almost the same. Oil radiator is heated slowly and it will dissipate the heat slowly for a while after the electricity is cut off. The electrothermal film is heated quickly and it gets clod as soon as the electricity is cut off. But the heat productivity is almost the same at the same power. Heating capacity and power consumption of the two products are the same. The electrothermal film is smaller. The electrothermal film is recommended.
Q:Are there any hazards during the glass wool construction?
Glass wool and asbestos are completely two different products. The raw material of glass wool is glass. Protection work must be prepared during construction.
Q:Is centrifugal glass wool board suitable for home use?
It can be easily broken and produce fine suspended particles. If the glass wool is of poor quality, you'd better use plastic bags or non-woven fabric to wrap it when using. So you must choose brand whose products are of good quality. Also if it is for the acoustics, it will do harm to the human body if inhaled into the lungs. So be sure to choose a renowable brand o centrifugal glass wool.
Q:The difference between the double rough surface soil and the ordinary soil?
Ordinary geomembrane generally refers to both sides is double smooth geomembrane smooth rough texture, the national standard GB GB type, type two and urban construction standard (equivalent to American Standard) of the points, the thickness is generally between 0.2-2.0mm. The double rough surface soil engineering film is a soil film with coarse grain on both sides, and the urban construction standard is only accepted by the national index. General thickness is between 1.0-2.0mm
Q:how is the effect decoration color film.
Very good! Color film is a new reinforced glass decorative materials, color film broke the previous traditional process that uses major pictorial material to strengthen the glass as decorative materials, replacing an enhanced pictorial material that dominated the glass sliding doors, glass cabinets, glass and other glass decorative backdrop materials. Glass color film with enhanced pictorial material no advantage: 1, color film made of tempered glass finished glass has high safety, after such a color film glass glass products, when the product was crushed, no glass fragments It will be like the usual glass littered, but all the pieces are glued to the glass color film, so you can ensure the safety of users guarantee the broken glass. 2, tempered glass color film having a high environmental protection. In the past pictorial material reinforced with glass, many of which are reinforced by a number of pictorial material volatile substances and toxic substances to be made, the finished product is made with an very strong toxic, not only to the workers this long accumulated in the processing of glass easy poisoning, after which the user in such a room to stay for a long time are likely to be poisoned at varying degrees , while the glass color film is the application of advanced inks and more environmentally friendly material, and has no toxicity.
Q:Which standard form of railway construction engineering inspection certificate is for geogrid and geomembrane separation layer? No. 52 or No. 59?
Q:How does the insulation effect of the heat of the glass film?
Building insulation energy-saving glass membrane are generally to be attached to the inside of the glass and attached to the medial better, this is because the film glass paste in lateral vulnerable to wind and rain, and other accidents lead to damage to the glass membrane, which affects the actual life of the glass film and glass membrane attached to the posterior medial can avoid these. Glass film in actual use is through reflection and absorption to stop more heat into the room of, reflection is actually glass film metal layer in effect, while the heat absorption is through the special structure of the glass film to heat adsorption on the glass film. The glass film attached to the inside due to the protection of a good general as long as the real film is used a few years, there are several decades, because the glass film will not be easily scratched, scratched, or appear what other circumstances.
Q:composite geo-membrane, two cloths and one membrane geomembrane 6 meters thick material how to use multiple sets of quotas
10 meters dam seepage-proof construction, 1000g composite membrane quotas are not accurate, depth 6 meters, each design Institute are not the same, two cloths one membrane composite membrane 800 grams per square meter is sufficient .

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Premium Related Products