• Hot Salings Cup Lock Scaffolding from China System 1
  • Hot Salings Cup Lock Scaffolding from China System 2
Hot Salings Cup Lock Scaffolding from China

Hot Salings Cup Lock Scaffolding from China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1)HOT SALINGS CUP LOCK SCAFFOLDING

 

2)Material:Q235,Q345


3)Features:Welding by Robot


4)Surface:HDG,OR PAINTED

 

Size For Standard :    

Product Name

Specifications(mm)

Weight(kg)

Standard

3000*48*3.0

15

Standard

2400*48*3.0

12.47

Standard

1800*48*3.0

9.57

Standard

1200*48*3.0

6.66

Standard

600*48*3.0

4.67

Size For Ledger :

Product Name

Specifications(mm)

Weight(kg)

LEDGER

2400*48*3.0

8.44

LEDGER

1800*48*3.0

6.43

LEDGER

1500*48*3.0

5.43

LEDGER

1200*48*3.0

4.43

LEDGER

900*48*3.0

3.44

LEDGER

600*48*3.0

2.43

LEDGER

300*48*3.0

1.44

Quick Details:

Place of Origin:Heibei, China

Model Number: W104

Material: Q235

Surface: Painted or galvanzied

 

Hot Salings Cup Lock Scaffolding from China

Hot Salings Cup Lock Scaffolding from China


Packaging & Delivery

Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.

Delivery Detail: 1 month after the contract or as customer's requirement.


Specifications

1.Great Reputation Cup Lock Scaffolding

2.Three Year Warranty

3.Operating Friendly

4.Full Safety Devices

5.Provide OEM service

6.Reasonable price


FAQ:

 Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team. 

Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
Sweeping rod: part of the scaffolding works, sweeping rod distance from the ground 200mm, connecting the vertical pole of the horizontal rod. Divided into vertical and horizontal sweep rod, play the role of scaffolding stability.
Q:THE SCARLET LETTER
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q:What is a bowl buckle scaffold? What is the full house scaffolding?
2) in the scaffolding scaffolding in the interior of the building: in the end, each built a layer of the wall, it is transferred to a floor, a new layer of masonry, it can be used for external wall masonry construction and interior decoration. Scaffolding materials used less, but the assembly and disassembly frequently, it requires lightweight and flexible, easy assembly and disassembly. The structure of the folding type, pillar type and door frame, etc..
Q:i need help with the musical elements of these songs, such as the instrumentation, rhythm, texture, timbre and key. thanks
Here is a good bibliographic index:
Q:How can you scaffold so that they construct their own meaning about a religious perspective on current events?
Introduce the basic tenets of several major religions, then work through the historical contexts, and finally, explain your religion's belief system. Good Luck....
Q:Should I work Offshore or Scaffold?
offshore for sure buddy,,scaffolding is a pain sometimes,,
Q:What is scaffolding in ESL?
A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.
Q:i had an industrial piercing 2 days ago and was just wondering roughly how long untill i can change the bar? ive seen a few i like and want to change the boring one asap,..also, do u think my ears look crowded??? i dont have any pictures but on my left ear i have earlobe, tragus and rook, and my right ear i have ear lobe, anti-tragus and industrial..just wondering what u think.. thankss x
4-6 weeks isn't long enough. You have two fresh piercings that are connected to each other which gives you a bit more of a high risk of one not healing properly. You need to give your body time to let the holes fully heal. Take it from someone who took out her industrial bar 3 months into having it to clean it and had the top hole close up. You really should give it at least 6 months if not longer to fully heal.
Q:hi there, im looking for scaffolding, is there any one knows a well known name for this service. please hurry up.thanks
Scaffolding or Rigging
Q:Would like to build a scaffold to use to paint interior of house using common materials (wood, PVC pipe, tubular steel etc) which I can buy at Home Depot and quot;boltquot; together. Top level only needs to be 6ft high to do what I need.......Any ideas or plans....rather than renting or buying a ready made one? Thanks
2 eight foot ladders +1 extenision plank = 1 scaffold

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products