Hot Galvanized Ringlock Scaffolding System with Material of Q235

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Ring Lock Scaffolding Description 

 

Ring-lock scaffolding consists of cup-lock connector,post,cross bar,diagonal brace,base and top brace.Safe and convenient to operation,fast to assemble and dismantle,widely used in scaffolding construction,such as formwork scaffold and fitment construction.

 

 2. Main Features of the Ring Lock Scaffolding

 

 - Using less pipes

 - Easy to install

 - It can be used again and again for nearly 20years 

 - Easy to storage and transportation 

 - High degree of standardization

 - Easy and quick erection

 - Excellent stability and bearing capacity

 

3. Ring Lock Scaffolding Images

 

Hot Galvanized Ringlock Scaffolding System with Material of Q235

Hot Galvanized Ringlock Scaffolding System with Material of Q235

Hot Galvanized Ringlock Scaffolding System with Material of Q235

 

4. Ring Lock Scaffolding Specification

 

 material: Q235

 tube size: 48.3*3.2mm 

surfacing: galvanized

the usual size: 0.5-3m

We can design and manufacture as per your specific requirements.

  

 5. FAQ of Ring Lock Scaffolding

 

We have organized several common questions for our clients,may help you sincerely:

1) What can we supply for you? 

We can supply base jack,ring lock scaffolding system,steel pipe/tubes,etc. 

  

2) Why choose us?  

• Decade years of experience in the field of scaffoldings 
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price.OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.

 

3) How about our after-sale service?

Any of your reasonable request will be responsed within 24hours.If you need the

supervision of installation,we could arrange one or two engineers to provide the technic service on-site.

 

 4) What about the package and shipping time?

Packing:  packed in wooden pallet in containers.  

Shipping: We have various shipping ways for our customers, such as express,by air or by sea,railway,etc.Normally it takes around one month.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Should the WWE bring in New Jack to work scaffold matches with John Cena & Randy Orton?
New Jack? Jack Swagger O_o
Q:A worker on a scaffolding 85ft above the ground needs to lift a 440lb bucket of cement from the ground to?
Integral 0 to 85 [440 +(85-x)]x dx
Q:my scaffold piercing wont stop bleeding, really scared, please help?
Did you try peroxide? Put some on a cotton ball and clean around the piercing. If this does not go away within two days and the bleeding persists your body may be rejecting the metal from your skin. This will cause the peircing to eventually migrate out. Go back to the piercer and see what they say.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:I have a rather unattractive lump on my scaffold piercing, and i have no idea what to do with it?
ive got that too on my ear i also had it when my i had my belly peirced it went away after a while
Q:How much is a scaffold piercing?1-10 on pain?
I would say about a 6 maybe 7... and its a pain for the first few months.. like it gets sore if you lay on it to much ect :)
Q:how long sould you wait to dye your hair after getting a scaffold piercing?
I'd leave it until its fully healed. If it isn't healed then if you get the dye in the holes it can make it infected. I had a cartridge piercing and dyed my hair and it got infected and I had to take it out and now I have a big lump on my ear. So wait until its healed before dying your hair.il its healed before dying your hair.
Q:Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
Fastener steel pipe scaffold, scaffolding, scaffolding, plate type pin type scaffold is currently widely used scaffolding,
Q:How to weigh the weight per meter of wrist button scaffold
The longest component of the scaffold 3130MTM, the most reconstruction pieces 40.53KG.
Q:Weight of bowl buckle scaffold
Vertical rod specification A (mm) B (mm) theoretical weight (kg) riser LG-60 6004.30 LG-120 12007.41 LG-180 180010.67 LG-240 240014.02 LG-300 300017.31

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range