• HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--018 System 1
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--018 System 2
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--018 System 3
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--018 System 4
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--018

HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--018

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Q:Real estate business, when to carry forward the cost?
For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit
Q:How is China's housing market trend ?
grow and mature, their behavior will be standardized; related system construction will gradually be improved.
Q:How to classify real estate?
Residential real estate market can be further divided into ordinary residential market, high - end apartment market, villa market
Q:What are the aspects of the risk of real estate investment and development?
Real estate investment development is a dynamic process, both the benefits and risks exist. As the real estate has the location of the fixed and immutable, large investment
Q:What is the real estate bubble economy?
so as to attract new buyers - these people are generally the sale of assets for profit speculators
Q:What conditions should a real estate agent have?
past happy things, friends and family expectations
Q:What are the real estate management professions?
with a more solid economic and management theory, the system master the real estate management disciplines theory and skills
Q:How is China's housing market in other aspects of the trend ?
China's other aspects of the real estate market in the future the following changes will occur:
Q:Real estate in the "five card" which five?
Construction project planning permit" is the construction project in line with the requirements of urban planning legal evidence;
Q:The future of real estate?
nterest rate plus reserve ratio, the country eight, the purchase order, 10 million resettlement room hard targets

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products