HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--022

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How is China's housing market in other aspects of the trend ?
the future price of the housing market in our country will gradually become reasonable and the house price income will be higher than that of entering into a maintainable space.
Q:China's real estate market began to develop rapidly is what year
1991 to 1995 irrational speculation and adjustment stage, Deng Xiaoping Southern speculation after the southern real estate speculation prevailed, the final hard landing, real estate into a downturn
Q:When is the introduction of real estate?
China 's real estate market is introduced from the eighties
Q:Kentucky is selling real estate how to understand?
because he knows the property and location will be the success of each branch of the most important Factor
Q:When China introduct the real estate?
mainly in China's southern, Hainan, Shenzhen, Zhuhai, Huizhou, Beihai city appeared in the real estate market overheating problem
Q:What is the difference between land valuation and real estate valuation?
Land valuation is based on the principles, theories and methods of land valuation
Q:What is the main property sales?
Second - hand is the real estate intermediary companies, mainly engaged in second - hand housing rental and sales
Q:What is the meaning of the term in the real estate?
Intermediary companies should visit the owners on a regular basis to understand the situation of the owners. This is called dishwashing
Q:What is the red line in the real estate project?
Real estate often said that the "red line" is the land for its development and use of the land range (land acquisition within the scope of the land, such as green space, planning road land)
Q:What is the gross margin of the real estate industry?
in order to control the risk of developers In order to return as soon as possible funds will sacrifice part of the profits of advertising costs by 1-1.5% of total sales

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range