Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2 m.t.
Supply Capability:
100000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ringlock Scaffolding 

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance. 


Ringlock scaffold has the following features: 


1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection. 
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes




Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Specification of Ringlock Scaffolding


     Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

                 Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

    

 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

                                              The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

                                                       The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

                                                               Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

                                         Hollow Head Jack And Jack Base


Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment


600

38

150*120*50*4

HDG


600

38

150*150*4

HDG


Accessories


Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal


Packing


Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Inspection

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

    Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

       Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

        Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Project


Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal


More Photos

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal

Galvanize Ringlock Scaffolding Easy Assembly Top Quality Metal






Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Requirements for the current bowl frame
The vertical distance is the distance between two adjacent vertical bars along the length of the scaffold
Q:Scaffolding and scaffolding, what is the difference
Different node: node of scaffolding is scaffolding, bowl, node is the eight hole discThe diagonal rod lap in different ways: diagonal scaffolding with ordinary steel pipe fastener, oblique rod, scaffolding is used with the oblique rod.
Q:Found two different bowl buckle scaffold specification JGJ166-2008
Are you sure is a type steel pipe scaffold? Steel pipe is a fastener link
Q:What are the requirements for the erection of the bowl - shaped steel tube scaffold
According to the specification requirements of every three vertical and horizontal cross set with scissors support; height of more than 8 meters in the low to vertical, vertical and horizontal set of scissors. Generally speaking, the technical requirements of the roof beam, the coupling beam parts are independent support, whether the existence of suspension.
Q:Scaffolding/Industrial Piercing Questions...?
Im pretty sure you can have retainers for your industrial piercing if you get it done buuuuut you wont be able to put them in for a couple months cause industrials take a long time to heal. And like the person said below it really depends on your skin tone and what color retainer you buy. You shouldnt have a problem with the industrial though cause people cant see mine if I have my hair down. They take up to 1 year to fully heal. You can swap your piercings out after 3 months but beware it can close up on you if you have difficulty putting it in. You HAVE to wait 3 months before you can put retainers in. Industrials are 14g piercings so make sure your retainers are the right gauge. Your ear will be sore for a long time dear. Mine didnt hurt while getting it pierced cause I have a high pain tolerance but my ear was sore and bruised afterwards. The healing process is very delicate and your ear will be sore for a couple months. Make sure you get the piercing on the ear you dont sleep on. I use a 50/50 solution of Betadine and distilled water. Other piercers have different cleaning regimes though, so listen to your piercer. I always clean it with warm water and use a Q-tip to clean around the piercing. Then I put the cleaning solution on and twist the piercing around GENTLY so the solution will go into the cartilege. I do this 3 times a day and i will do it for a month. Industrials are really delicate piercings so always keep it clean :)
Q:Ariel Atom Supercar, Hypercar or a just a bunch of scaffolding?
No such thing as a Hyper car. It is a Sports car. It does not even classify as a Supercar because its top speed is around 125mph. A Supercar's top speed is 185mph+. A high-end sportscar is 155mph+ A regular sports car is 130mph-155mph. I am counting the Ariel as a sportscar because of its quick acceleration. It is a great car. Very fun to drive. Lasts forever with the Honda Civic engine that it has. It is an exciting car.
Q:What is a new type of scaffolding?
Socket type steel pipe scaffolding is a continuous fastener type, bowl buckle scaffold after the upgrading of products.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:rental of Hydraulic scaffolding?
your best thing to do is to look up in the phone book or Internet. there are lots of different companies that rent out lifts. Depending on where you live. I know of a few nationwide ones, Hertz for one. Just call the company and tell them you need a lift. if the work is to be done outside I would use a small boom lift, but if it needs to be done inside just a regular platform lift should do the job. they also come in gas, and electric but being that you only need one to reach 16 ft. you probably only need an electric, just be sure to charge it over night when you are not using it! You will probably have to make a credit card deposit also.
Q:At what height do we need to erect scaffolding?
Any height you can fall from and get hurt. I would say this would be above say 6 feet or so. Scaffolding is cheap. You can rent it around here for $14 for two weeks.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range