Flexible Duct for Mounting Systems Insulated and Flexible
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 25 litre
- Supply Capability:
- 500000 litre/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Aluminum foil Ducts Description:
The production technologies and products performance of aluminum foil facing have been up to international advanced level. The aluminum foil facing products are mainly used for HVAC system, refrigerators, building thermal aluminum foil facing insulation and laminated with glass wool and rock wool to increase the insulation function.
2.Main Features of the Aluminum foil Ducts:
• Light weight
• High manufacturing accuracy
• High strength
• Small inertia resistance
3.Aluminum foil Ducts Images
4.Aluminum Foil Fleixble Ducts Specification
TYPICAL PHYSICAL PROPERTIES:
PROPERTIES | UNIT | VALUE | TEST METHOD |
Basic weight | gsm | 80 | ASTM D646 |
Tensile strength: M. D. X. D. | N/25mm | 95 50 | ASTM C1136 |
Burst strength | N | 25 | ASTM D774 |
Reflectivity of foil surface | % | 95 | ---------- |
Temp. Resistance | -29°C +66°C | No change keep soft | ASTM C1263 |
Water vapor permeance | ng/N.s | 1.15 | ASTM E-96 |
Water Soak Test | 24hrs | No delamination | ---------- |
Width: 1.0m, 1.2m, 1.25 m, 1.30, 1.37m
Length: 200m, 500m, 1000m, 2500m, 2750m, 3300m
Core I.D.: 3"(76mm ±1), 72mm ±1
Based on order, special sizes are also available.
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
(1)What is the storage condition?
The products should be stored at room temperature and kept from wet and heat source.
It is essential, as with all pressure-sensitive tapes, that the surface to which the tape is applied must be clean, dry, and free of grease and oil.
The user should take test and do trial-application on the above products before coming into application so as to witness and ensure suitability for user’s special purpose and technique.
(2) How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
- Q:How to optimize the construction management to improve the quality of construction projects
- I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!
- Q:Will the embedded stove why use stainless steel corrugated hose connection?
- Do not open the window, enjoy the fresh air 24 hours a day, to ensure adequate ventilation (hourly indoor air replacement 0
- Q:How is the flexible tube of FRP composite pipe defined
- Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
- Q:Can the kitchen sewage pipe pass through the walls of the stove wall?
- The system can avoid the hot bridge in winter, greatly reducing the indoor heat loss through the external walls; summer can greatly reduce the external radiation from the sun to the indoor heat conduction, and thus the heating, air conditioning energy consumption decline
- Q:To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
- It should be JGJ130-2001 Ministry of Construction 2001-02-9 approved 2001-06-01 implementation
- Q:Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- 1.5M is the thickness of the board? If it is, in view of the large amount of concrete from the major, then the long spot of the short spot of the prisoners need to pay special training program reported to the chief engineer or expert approval, which is also the most important [template bearing capacity design calculation], proof of design Of the construction program to meet the bearing capacity of concrete to ensure that the template and its bracket should have sufficient carrying capacity, stiffness and stability, can reliably withstand the weight of pouring concrete, side pressure construction load. In recent years, because the construction of non-standard template led to the collapse of a lot of scaffolding, hope to be cited
- Q:What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
- From the environmental point of view and save the cycle of insulation coating is good, insulation coatings can be divided into internal and external insulation and other products
- Q:On the classification of car repair, the best details Thank you Such as sheet metal workers, car circuits, etc. Thank you
- There are also special materials such as bamboo, so rare, no longer introduced
- Q:What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
- national, provincial and municipal projects related to the construction of policies, laws, regulations and the relevant industry regulations
- Q:We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Construction workers classification and breakdown of ordinary types of work
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Flexible Duct for Mounting Systems Insulated and Flexible
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 25 litre
- Supply Capability:
- 500000 litre/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords