Fir-tree Mount Cable Ties

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Pieces pc
Supply Capability:
50000 Pieces per Day pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description

 

1.One-piece fir-tree design with disc is similar to push mount cable ties but the disc can enhance the stability of fixing and avoid dust and water invasion.

2.Additional cured tab below the buckle will fasten and maintain bundles on the axial.

3.Fir-tree push mount design applied to various thickness of board or one-side thread hole.

4.Applied to different industries such as automotive, aviation, white goods manufacture, and panel building.

5.Special specifications supplied by customers' order.

6.Material: Polyamide 6,6, UL94 V2

7.Color: Black

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction of hydropower in the construction of hydropower line gap between the wire
Prepare a small air compressor, with air guns to remove the debris and water in the tube.
Q:The use of composite heat - shrink tape
one end of the heat shrink tape adhesive surface heating, according to 1/2 lap winding shrinkage, while the side of the heating side of the heating shrinkage; or winding finished and then the overall heating shrinkage (note the heating , the beginning of the winding, the front should be overlapping two layers; you can use the fire (or electric gun) for heating, to the edge of the plastic surface can be exposed; contraction of the same side of the winding two layers, with a tie or wire fixed; After the completion of the tie or wire can be removed Long garden of the world
Q:Fire line slot CT100 * 100 * 1.8 What does it mean?
Part of the construction process requirements for reference Metal Trunking Wiring Installation Construction Technology 1 Scope This process standard applies to the installation of metal trunking wiring in buildings
Q:I would like to ask how to set up the company's telephone management, to Granville, for example, how to set the extension number, install the telephone line, set the phone password,
With a multimeter (or shake the table) to measure the insulation, not more than 0.5M Europe on nothing, as long as the insulation of the wire enough, PVC pipe is not used to waterproof, it is used to prevent mechanical trauma, even if not irrigation, buried A long time the tube also has water vapor, is inevitable, nothing!
Q:How is the cable fixed in the bridge?
There should be a fixed cable in the bridge cable, you can directly with the cable tie to the top. Cable bridge: cable bridge is divided into slot, tray and ladder-type, mesh and other structures, by the bracket, arm and installation of accessories and other components. The inner frame of the building can be set up independently or attached to various structures and corridors. It should be characterized by simple structure, beautiful appearance, flexible configuration and convenient maintenance. All parts are galvanized. , Installed in the building outside the bridge, if it is in the vicinity of the sea or belong to the corrosion area, the material must have anti-corrosion, moisture resistance.
Q:What is the difference between PC wire and PVC wire tube?
Color voltage use red + 5V motherboard circuit, memory module power supply, optical drive, hard drive and other equipment power supply yellow +12 VCPU, graphics power supply; for the standard drive circuit power supply, such as optical drive, hard drive motor orange + 3
Q:How is the line of the patch panel in the LAN?
Find the relevant units ah, such as the mining bureau ah, will be issued by the relevant acceptance report can be produced
Q:Is the cable clamp also divided into high voltage cable clamp and low voltage cable clamp?
Single-core cable line grounding line commonly used grounding 1. shield one end directly grounded, the other end through the protective layer to protect the ground: When the line length of 500 --- 700m and below, the shield can be used directly to one end of the ground (cable terminal Position ground), the other end through the protective cover to ground. 2. shield the midpoint of the ground: When the line length of 1000 ---- 1400m, the use of midpoint grounding. in the middle of the line position, the shield directly grounded, the cable ends of the shield through the protective cover to ground. The middle ground is usually required to install a straight connector. Install an insulated connector at the midpoint of the line. The insulated connector disconnects the cable shield, and the shield is grounded through the protective cover, and the two cables are shielded and grounded directly. 3. Shielded cross-connect cable lines are very long (1000 --- 1400m above), you can use shield cross-connect. This method is divided into three equal parts of the length of the three or three times the number of segments, each section between the installation of insulation joints, insulation joints between the three-phase shield with a coaxial cable, cross-linked box for transposition, cross The interconnection box is provided with a set of protective protector, and the two sets of insulated connectors are arranged on the line.
Q:The role of cable connector box classification installation requirements
Should be the power cable and weak cable directly on the side, the middle partition separated. Standard: JB / T-2000 Standard Name: Electric Control Power Distribution Cable Tray Standard Status: Current Implementation Date: 2000-12-1 Issuing Department: National Electrical Appliances Accessories Standard Committee Content: This standard provides for electric control distribution The definition of cable bridge, model code, requirements, test methods, inspection rules, signs, transport and storage. Source:
Q:How to connect the high voltage distribution cabinet twice
On the length of the slot board (from the one end of the trunking board), the width of the trunking board is marked as a square, and then the section is a square and then diagonally cut
Our facilities are equipped with over 150 injection molding machines to produce full line of cable ties, stainless steel ties, wiring terminals, wiring ducts, flexible conduits, adaptors, and so on. The number of employees worldwide is around 1,500. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Taiwan
Year Established 1976
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008;ISO 14001:2004;ISO/TS 16949

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China
Export Percentage 91% - 100%
No.of Employees in Trade Department 21-50 People
Language Spoken: English, Chinese, Spanish, Japanese
b)Factory Information  
Factory Size:
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average