Durable Manual 12m 15m 18m Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Engineering Construction Durable Concrete Placing Boom
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q:What is the Hand operated concrete distributor?
- Concrete spreader is a new product developed in order to enlarge the pouring range of concrete and improve the level of pumping construction mechanization
- Q:What are the weekly inspection items for concrete spreader?
- Check the lubrication situation is good, and timely replenishment of lubricating oil
- Q:What are the specifications of concrete spreader?
- A counterweight box is arranged on the balance frame. It settled in the main beam rear connecting flange, screw firmly, to ensure the stability of the incident
- Q:What is the structure of a concrete distributor?
- The main frame beam is connected to the front end of a rotary bearing, and the bar, bar before, before the formation of the rotating part, in human pull around the rotary bearing, rotate 300 degrees
- Q:What's the design plan of the concrete spreader?
- Hinge structure on the tape machine design by two light truss, is hinged on the frame of the rotary hopper, through a hinged cylinder between two truss angle adjustment according to needs; in the lower part of the tape machine, design a universal wheel, can move along the axial cylinder in truss drive, adjustable belt tail height
- Q:What are the monthly inspection items of the movable concrete spreader?
- Check the insulation resistance of the circuit of the motor, the grounding of the electrical equipment, metal case and metal structure
- Q:What is the working principle of the distributor?
- When removing the cloth should be cleaned of residual concrete pump tube, then the weight of crane removed, then removed from the distributor to the specified location
- Q:What are the acceptance items of concrete spreader?
- The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
- Q:How to install and use the distributor?
- In the process of assembling and installing concrete distributing machines, the constructors must wear safety belts when they work at high altitude, and the seat belts must be hung where they can be stressed. Construction cable must be overhead or buried in the ground, not flat and put
- Q:How to distinguish tower type distributor and general distributor?
- Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Durable Manual 12m 15m 18m Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords