Cup-lock Scaffolding with HDG Q235 Steel Best Prices

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Main Intriduction of Cup-lock Scaffolding:

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 


2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

     

 

3. Images for Cup-lock Scaffolding:

 

Cup-lock Scaffolding with HDG, Q235 Steel, Best Prices

 

 

 Cup-lock Scaffolding with HDG, Q235 Steel, Best Prices

Cup-lock Scaffolding with HDG, Q235 Steel, Best Prices

4. FAQ of Cup-lock Scaffolding

 

        a) How to guarantee the quality of the products?

        We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

        b) Why Choose us?

        Delivery Detail:

       10-25 days after receipt of payment. We are  the biggestmanufacturer on formwork and scaffolding accessories in China. We have more than 40    

       years experience on manufacturing and exporting. 

       c) Response will be carried out  in 24hours  after receiving any complain or request.

       Any formwork cost can be refund after order is confirmed. 

       If the products are not based on the requirements, there will be the relevant compensations made for you. 


What promises can be done by us?


       If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

       If printing required, please advise asap because the whole set need much more time to complete.

       Please DO check goods when courier knocks your door and contact us asap if any issue.         

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are scaffolding poles usually made of?
They are usualy made form Aluminium.
Q:Is swelling in a scaffold piercing okay?
this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
Q:What's the story in March to the Scaffold?
March To The Scaffold
Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
The horizontal sweep shot in vertical sweep shot, passed to the pole and then transmitted to the base through a transverse rod sweeping force.
Q:What are the requirements for the removal of scaffolding
3, to the lower part of the scaffolding removed the last of a long pole, should be first in proper position of the erection of temporary bracing reinforcement, and then remove the wall; and by dividing the facade scaffolding removed when the ends do not remove scaffolding, should be set up the wall and cross bracing reinforcement according to the provisions
Q:does scaffolding uses truss or frame?
Overall, scafolding is almost always frame because it can be built up in sections and removed for access if needed. The diagonals are bracing, not trusses. Having said that, some scaffolding uses truss pieces (triangular braced parallel rails) to span between posts for increased strength.
Q:Industrial/Scaffold Piercings.?
love them, when theyre done correctly. getting mine done soon.
Q:describe Vygotsky’s contribution to our understanding of cognitive development? What is scaffolding?
Cognitive development is the growth of a child when they have sexual urges
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:Steel tube scaffolding construction labor time
From the first floor to the beginning of the facade plaster. Always have timberman. How many days to look at your building area.Scaffolding steel pipe specifications and construction requirementsScaffold steel pipe specification1-6 m half a meter, the thickness is generally 2.4--2.7 mm diameter is 48 mmGenerally do not deal with the surface, a number of anti rust paint

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range