Cup Lock Scaffolding Easy to Mantain and Transport

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport

3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

    5.   FAQ of Cup-lock Scaffolding

    1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

 3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I want to get and industrial/scaffold, but...?
i got mine a month and three days ago its not that bad at all. people tried to scare me out of it saying that same thing and don't worry it wont happen. besides if you get really scared this might happen every couple weeks just put in two separate bars. oh yea and clean it with alcohol it makes it heal faster. mine is already done healing and with the spray they give you it could take up to a year
Q:How can teachers use scaffolding?
You need to relate new class knowledge to old knowledge, and also make learning materials for new activities highly structured, and gradually less structured as you move through the topic.
Q:An important industrial (scaffold) piercing question.?
should be fine. if its healed. never know what could happen if its not healed. but if you have had it for over a year and a half, you should be fine. because the tongue rings are pretty big, they could get bumped easier. which could lead to them being irritated and also hypertrophic scarring. if you just want the barbell look you can get really short barbells, that would diminish the possibility of all that. you can even get some pretty funky beads for the ends of em. he** you could put hoops in them or watever. oh, just a warning, unless they were pierced at a 14 g. which it would either be that or a 16g. most likely.then they might require a bit of stretching to get that 14gauge through, depending on the gauge it was pierced at. it will probably be kinda sore after that. but that should go away within a week or two. oh yea and if you can use the tongue rings ok, then you should be able to use the retainers :p good luck, hope it turns out gouda <3 :p
Q:More than 3 floors of the building can be erected with bamboo scaffolding
Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work on or off the construction of the external security network and the installation of high altitude and other components, it is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.
Q:Floor type scaffolding construction program is what kind of, what role?
Job requirements;(4) has the advantages of simple structure, convenient assembly and disassembly;(5) according to local conditions, local materials.  3 load of scaffold, masonry engineering requirements: 2700N per square meter per square meter 2000N, decoration engineering, scaffold in 2500N per square meter per square metre, scaffold 1000N, special circumstances should be determined by calculation.  4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, attention not allowed to keep the foot hand eye position: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick wall, brick lintel and a beam of 60 degree angle triangle, windows and doors on both sides of the 3/4 brick and 1 brick range?.
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.
The construction scheme, the frame foundation, the frame stability, the rod lock, the foot board,
Q:how good is scaffolding in peru ?
Hi there, from what I have seen I would give it a 5 on a scale 1-10, not very safe.
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
To make sure the components are securely locked together and will not collapse when used.
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from?
85kg. is 42.5kg each cable. 6.4/1.4 = 4.571:1 ratio. Add both sides. (440/5.571) x 4.571 = 361kg. Add the 42.5, = 403.52kg. 403.52 x 9.8 = 3,954.5N tension in left cable.
Q:As Dimmesdale stands beside the scaffold, what does the crowd expect him to do?
e. do his own homework Only joking. It's definitely d. Or c.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range