Construction formwork and plastic Formwork

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
10000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Place of origin: Taizhou City, Zhejiang Province, China Reusable: above 100 times Material: Plastic -ABS
Waterproof: Yes Thermal deformation temperature: above 150 degree Celsius Certificate: ISOTS16949
Oil: no need Weight: about 15 kg per square meter Assemble and disassemble: Easy and quick
Eco-friendly: Yes

Product Description:

Plastic Formwork Construction formwork  plastic concrete formwork

Saving your time, money and energy !!!

 

Construction formwork and plastic Formwork

What is Details of our products Plastic Formwork Construction formwork plastic concrete formwork ?

Features:

1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,

where  Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork

is more cost effective.

2. Waterproof --  As the nature of plastic material. It's imputrescible and rustless,

especially suitable for underground and watery circumstance.

3. Interlocking Design -- No release agent needed, good effect of demolding.

4. Easy deassembly -- The template will be separated easily from concrete 

5. Simple Installation -- Light weight and safe to handleeasy cleaning and very robust.

6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability. 

7. Recycable -- Waste scrap molding board could be recycled.

What is Advantages of our company ?

Our anvantages

 

High quality

Reasonable price

Strict delivery time
Good after-sales service

Profession maker for 21 years

Gold supplier 9th year

Strict quality control

professional injection mould
3D design

Product Photos/ Plastic Formwork, Construction formwork, plastic concrete formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

Construction formwork and plastic Formwork

FAQ:

1.Q:Are you a factory or trading company? 
A: We are a factory of plastic formwork.

2.Q:Where is your factory located? How can I visit there? 
A: Our factory is located in Taizhou City, China.You can fly to Ningbo airport directly.All our clients, from home or abroad, are warmly welcome to visit us!

3.Q:How can I get some samples? 
A: We are honored to offer you samples.

4.Q:How does your factory do regarding quality control? 
A:"Quality is priority. we always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained ISOTS16949  authentication.

Why Choose us?

We are China Leading Moulding Manufactuer

Inspected by the Inspection Institution of Bureau Veritas Certification.

100% QC inspection Before Shipmeng.

Best Quality & Best Service with Competitive price.

How to Contact Us?

If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .

 

Any building drawings is OK, just send us your drawing, we can make the plastic formwork  quantity for you.

 

And we warmly welcome friends from all over the world to visit our factories for business.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Shear wall plastic template support: the wall height of 2800, wall thickness 300, for example, using 12mm template, vertical sub-rib spacing (center distance) for the 200-250mm; 15mm template, vertical sub-Leng spacing (center distance) For 250-300mm. Compared with the normal use of bamboo plywood template, the distance between the second time, the roughness of the concrete surface is basically the same, but the concrete surface smooth, to achieve the effect of water concrete, perception quality is better. To meet the requirements of cast-in-place concrete wall forming and surface quality. Construction template structure should be simple, light weight, durable, easy to manufacture.
Q:How does the concrete on the plastic template remove (already glued to the concrete)
Water, washed with water, rubbing with things, spend time slowly removed
Q:Types of building templates? What is the water template?
With the development of the economy, the emergence of new materials in the building materials industry, the increasing number of types of building classification, there are four types of building templates
Q:Europe and the United States national construction template is made of plastic or wood
Part of the place with stones, as the case may be, but certainly yes, Europe and the United States have anti-seismic buildings
Q:Help. What is the price of the plastic building template?
Usually in square meters. But whether by square meters or by weight count, but the process is different, but the results will be the same unit price. Off to know how much the cost of this product, how much profit. The cost of each product produced by the factory are not necessarily, of course, the profit is not the same. Cost is the material, management, plant rent, utilities, machine depreciation and other costs together, and now PVC materials have different grades, the specific price can be found on the Internet to see.
Q:How is the plastic building template?
Strong plastic PP plastic template is a joint development of the company's patented product, is the national high-tech industrialization in 2000 to promote the project. The product is based on polypropylene, adding GF fiber, anti-aging additives made of a kind of engineering plastics. Is a plastic generation of steel (bamboo, wood) a new generation of building templates.
Q:Why the floor is not plastic building materials square wood and template
Is the plastic strong? The environment on the site you know, throw off how to do, have to find strong and durable.
Q:I heard that plastic construction template workers do not want to use, there is such a situation
The quality of the building template is relatively strong, compared to the cost is also higher. hope this helps!
Q:Plastic mold dynamic template, the size of the template
A lot of it? What are you talking about? Plastic mold points a lot of tonnage, there are 80T, 120T, 240T, 1000T, 1250T
Q:PVC plastic template deformation how to solve
Personally feel that PVC sheet deformation has more reasons. The main reasons are as follows.Pvc plate deformation are: physical deformation and chemical deformation.1. Physical deformation, cause:High temperature lead to deformation, if it is such a deformation, targeted plastic raw materials for high temperature modification, can effectively improve such problems. Improper textile lead to deformation, such deformation has two reasons, a plate of raw materials can not meet the actual requirements of the product requirements, re-deployment of raw materials formula to meet the actual requirements of the product can be. Second, the processing and storage methods are not correct, leading to deformation, such problems can solve the problem from the root causes.2. Chemical deformation: mainly the molecular structure of raw materials change.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range