Plastic Formwork System - Column Formwork

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Plastic Formwork System - Column Formwork

The column panels are interconnected using the standard nylon locking handles. Each panel will require 9 handles. The forming face has 6 parallel rows of fixing holes to allow the orthogonal connection of the panels in a “star” shape. The rows are placed at a distance of 100/50mm the one from the other, allowing the forming of square and/or rectangular columns with side of 150 to 600mm.

light weight, high strength

The material of modular formwork is PP (polypropylene) mixed with special glass fibers which enable panels to hold high pressures.

The handles are made by high strength Nylon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 40cm walls.


product name

Modular formwork

origin

China

color

Black

material

PP

weight

11kg

tensile strength

40KN

reusable

100 times

Please send your project design drawing in Auto-CAD file to us, we will help to make formwork solution for you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I heard that there are building aluminum template and plastic template it? Which is better?
Wood-plastic building templates in the construction works more useful, more affordable, more convenient.
Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
With PVC board and steel ceiling of the board on it, to the hardware store to buy
Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Plastic building template to be extended when the expansion joints: As the plastic building template than the steel mold, wood mold thermal expansion coefficient larger, morning and evening laying plastic template must be reserved for about 2 mm expansion joints (according to the size of the day the temperature difference ), No need to reserve the expansion of the slit at noon. The length of the nail is generally 1.5 inches to 2 inches is appropriate, not too long or too short.
Q:How does the concrete on the plastic template remove (already glued to the concrete)
Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
Q:Types of building templates? What is the water template?
The type of template, according to the material to wood template, steel formwork, bamboo template, Gangmu combination template, etc.
Q:Does the building plastic template use it?
I used, hand drawing is very convenient, can use hundreds of times, made of plastic
Q:How is the plastic building template?
Strong plastic PP plastic template is a joint development of the company's patented product, is the national high-tech industrialization in 2000 to promote the project. The product is based on polypropylene, adding GF fiber, anti-aging additives made of a kind of engineering plastics. Is a plastic generation of steel (bamboo, wood) a new generation of building templates.
Q:What is the economic benefits of building wood formwork compared to plastic molds?
In summary, what template to use depends on what your structure needs.
Q:I heard that plastic construction template workers do not want to use, there is such a situation
The quality of the building template is relatively strong, compared to the cost is also higher. hope this helps!
Q:Plastic building template made of what material
Template template, as the name implies, is a model (you can think so), and the building template is in the construction of the project, before making the actual product, according to the design pattern, according to the data, such as component dimensions and other related ghosts , To produce a model consistent with the design specifications, and the production of this model is the template material

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range