Concrete Pumps Spare Parts Rubber End Hose DN125

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Concrete Pumps Spare Parts  Rubber End Hose DN125  normally made by special rubber materials,  NR rubber and other rubbers to make sure the quanlity of seals according to customer’s requests, and also package in plywood box or cartons and put into container.

Scope of Application of the Goods

The  Concrete Pumps Spare Parts  Rubber End Hose DN125  is a concrete pumps parts  for combined use with other concrete parts in for concrete pumps and truck pumps. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This seals can only be used in Schwing type concrete pumps and truck pumps as well, but not in any other operations.

Product Advantages:

OKorder's  Concrete Pumps Spare Parts  Rubber End Hose DN125 Channels are durable, strong, and safety.

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

Specifications:

DN:125MM

Lengh:3M/4M/5M/6M

Remark:Two side Coupling/ One side Coupling/Without Coupling


FAQ:

Q1: How long about delivery time  Concrete Pumps Spare Parts  Rubber End Hose DN125 ?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete Pumps Spare Parts Rubber End Hose DN125?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some goods according to customers request?

A4: Yes, we can produce  Rubber End Hose DN125 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design for porduction of seals.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world.


Concrete Pumps Spare Parts Rubber End Hose DN125

Concrete Pumps Spare Parts Rubber End Hose DN125

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to operate the concrete pump?
The size of sand and gravel, cement mark and mixture ratio should meet the requirement of the mechanical performance of the pump according to the specifications of the factory
Q:How can the concrete pump be installed and used?
Operation should be carried out before the examination, to confirm the normal electrical equipment and instrumentation, each part of the switch button, the handle in the correct position, the mechanical part of the fastening point is firm and reliable, and the chain belt tightness to meet the requirements, the normal operation of the transmission parts
Q:What are the functions of concrete pump truck?
According to the structure and use of divided into drag type concrete pump, truck pump and pump car, according to the power type is divided into electric concrete pump and diesel power concrete pump
Q:What are the skills of concrete pump?
In the process of pumping concrete, with the increase of pump pressure, pump impact force will force the tube to move back and forth, this is not only the loss of pumping pressure, and connecting parts between the pump in shock and intermittent tension state, can lead to premature damage, and rubber pipe cement slurry overflow, therefore must be fixed the pump
Q:How can the concrete pump pipe be cleaned?
The pipeline shall be provided with a stop valve, and the stop plate shall be inserted to prevent the vertical or upward tilting of the concrete in the pipe
Q:How much is the pump for a month?
Remove the pump car monthly fuel maintenance consumption (about 10 thousand to 5000), calculate the monthly one of the clay, probably earn about 14 to 150 thousand net!
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Tank car replacement, reversing the car by about 5-8 minutes
Q:When concrete is poured, how high can the concrete pump be put?
The car pump arm is long, traffic roads, the required pump stop position is bigger, so there are a lot of the site can not be use pump more than 60 meters (60 meters of general automobile pump, stop the pump and the leg position width of about 14 meters)
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:Which is the best home made concrete pump car?
The first line is 31 and Zhonglian, the price is expensive, the car is big, the problem is not, and there are many small problems

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range