Concrete Pumps Spare Parts Collar Disc Q80

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Concrete Pumps Spare Parts Collar Disc Q80  normally made by special steel materials,  according to customer’s requests, and also package in plywood box and put into container.

Scope of Application of the Goods

The  Concrete Pumps Spare Parts Collar Disc Q80  is a concrete pumps parts  for combined use with other concrete parts in for concrete pumps and truck pumps. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This pipes can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.

Product Advantages:

OKorder's  Concrete Pumps Spare Parts Collar Disc Q80  Channels are durable, strong, and safety.

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

Specifications:

CNBM No.

2090023

Original No.

066586005

Description

Collar Disc Q80

Remark


FAQ:

Q1: How long about delivery time  Concrete Pumps Spare Parts Collar Disc Q80  ?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete Pumps Spare Parts Collar Disc Q80 ?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some goods according to customers request?

A4: Yes, we can produceCollar Disc Q80 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world.

Concrete Pumps Spare Parts Collar Disc Q80


Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the main pump of the concrete pump electric control or hydraulic control?
Closed main oil pump behind the charge pump to provide a constant pressure to the displacement of the electromagnet by the current control output pressure to achieve the main pump pressure and pumping the commutation.
Q:What are the skills of concrete pump?
The operator and equipment management personnel should carefully read the instructions, grasp the relevant knowledge of the structural principle, use and maintenance as well as pumping concrete; use and operation of the concrete pump, should be strictly in accordance with the execution of instructions
Q:What is the difference between concrete pump and ground pump?
The pump is actually the day Linuo arm frame of concrete pump boom is known, a few day, after mixing through the boom pump, the efficiency is very high
Q:How much is the pump for a month?
In the mud, the price is about 25 yuan per square, according to my experience, more than 175000 points per month can pump 7000 yuan, totaling $
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Day pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to completeDay pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to complete
Q:What are the types, classifications and specifications of concrete pump?
According to the maximum hourly transport rate, there are 20-100m3 range, and most of the concrete pump can achieve two variable displacement or stepless variable
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:What are the specifications for concrete delivery pumps?
In the cold season, the construction of concrete pump should have anti freeze measures
Q:What are the causes of pipe blockage in concrete pump?
Therefore, in the JGJ/T10-95 "concrete pumping construction technical regulations," stipulated that the sand through the 0.315mm sieve shall not be less than 15%.
Q:What is the washing process of the concrete pump pipe?
Anti pump action a few times, release the pipe pressure, cut off the power supply

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range