Concrete Pumps Spare Parts Collar Disc Q80

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Concrete Pumps Spare Parts Collar Disc Q80  normally made by special steel materials,  according to customer’s requests, and also package in plywood box and put into container.

Scope of Application of the Goods

The  Concrete Pumps Spare Parts Collar Disc Q80  is a concrete pumps parts  for combined use with other concrete parts in for concrete pumps and truck pumps. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This pipes can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.

Product Advantages:

OKorder's  Concrete Pumps Spare Parts Collar Disc Q80  Channels are durable, strong, and safety.

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

Specifications:

CNBM No.

2090023

Original No.

066586005

Description

Collar Disc Q80

Remark


FAQ:

Q1: How long about delivery time  Concrete Pumps Spare Parts Collar Disc Q80  ?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete Pumps Spare Parts Collar Disc Q80 ?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some goods according to customers request?

A4: Yes, we can produceCollar Disc Q80 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world.

Concrete Pumps Spare Parts Collar Disc Q80


Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Concrete Pumps Spare Parts Collar Disc Q80

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can the concrete pump be installed and used?
Concrete pump should be placed on a firm and flat ground, with legs down and the body stable
Q:What is the concrete delivery pump?
The utility model relates to a machine for continuously conveying concrete along a pipeline by utilizing pressure, which is mainly used for building, bridges and tunnels
Q:What are the layout requirements of concrete pump for building engineering?
When more than one concrete pump or pump truck is pouring at the same time, the selected location should be the closest to each other. It is better to pour the concrete at the same time, so as to avoid retaining the construction joint.
Q:How much is the pump for a month?
Excluding oil costs, each side of the soil about 0.5 oil (Sany E series pump), the 7000 sides will be about 3500L oil X7.33=3 yuan, remove the wages of workers (4 per person 5000=2 million)
Q:What are the preventive measures for concrete pump?
When installing and designing pipes, avoid 90 as much as possible. And S shaped bends.
Q:What are the types, classifications and specifications of concrete pump?
According to the maximum hourly transport rate, there are 20-100m3 range, and most of the concrete pump can achieve two variable displacement or stepless variable
Q:Why would the plugging concrete pump pipe
When it is found that a bucket of concrete slump is very small, can not pump, should be in time the concrete from the bottom of the hopper release, if seeking trouble, forced pumping, easy to cause blockage. Avoid stirring with water in the hopper
Q:How to choose concrete pump?
A concrete delivery pump has the following main technical parameters: conveying displacement, outlet pressure, motor power and distribution valve form.
Q:If the concrete pump valve jam how to judge and deal with?
When the pipe is blocked, the pump shall be taken repeatedly, reversing the pump, and gradually pump the concrete at the pump's outlet back to the hopper and mix again
Q:How to judge the concrete pipeline blockage?
Judgment of blocking position: blockage usually occurs in bends, cones, and vibrating sections. At this point, the hammer can be beaten along the pipe, the sound is boring, blocking the place; sound crisp place is normal

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range