Carbide Spectacle Plate and Wear Ring PM260

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Carbide Spectacle Plate and Wear Ring PM260

1. Application: PM truck and trailer mounted concrete pump  

2. Size: upon your request

3. Lifetime:30,000~80,000cbm

4. HRA≥86

5. Material: tungsten carbide E5 grade, S35C (GB:35, DIN:C35,ASTM:1035 steel body ( or as your requirements)

6.Germany Welding rod used for hardfacing ( or as your requirements)

7.tensile strength ≥ 2600 N/mm2 ( or as your requirements)

Name

Specification

Material

Applicable brand

Wear plate

200

Tungsten
carbide
alloy

HBT60/HBT80/HBT90
concrete pump

Wear plate

φ230

Concrete pump truck

Wear plate

φ260

Concrete pump truck

Wear plate

φ230

Concrete pump truck

Wear plate

φ200

HBT60/HBT80/HBT90
concrete pump

Wear plate

φ260

Concrete pump truck

Cutting ring

S60-φ200

Cutting ring

φ230-s

Concrete pump truck

Cutting ring

φ260-s

Concrete pump truck

Cutting ring

φ230-Z

Concrete pump truck

Cutting ring

φ200-Z

HBT60/HBT80/HBT90
concrete pump

Cutting ring

φ260-Z

Concrete pump truck

Wear plate

PM

Cutting ring

PM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the details of construction machinery parts in sand casting?
9. (2) all kinds of cables. (4) either in production or life or attached to the building water pump, cabinet and equipment brought with all equipment, busbar support porcelain ramming material, manufacturing units or commissioned the construction enterprises in the construction site of the factory or production equipment, valves, acid. (2) a variety of metering device, especially the universal controversial problems put forward the principle of classification, dynamic, containers and other equipment, such as mechanical transmission, electrical, ladder, refractory lining, tower, is directly related to the investment, a reasonable division of various air conditioners, socket, heat exchanger, and the telegraph facsimile equipment, perlite, furnace metal embedded parts are the equipment. 7, transportation.
Q:Definition of large mechanical equipment?
A crane is a machine that cycles and intermittently moves. A work cycle includes fetching device from the extract to bring up the product, then move to the designated place down items, then reverse movement, the fetching device back in, for the next cycle.
Q:How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
As well as scaffolding, protective fence, all belong to the safety protection facilities, does not belong to the safety protection appliances. Safety protection tools are many, it is characteristic of the operator to carry, I will not list
Q:Where are the mechanical pressurization air supply facilities set up?
The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
Q:Where was the construction machinery conference held in 2015?
Support unit: Automobile and engineering machinery parts testing institute, Qihe Economic Development Zone, Shandong Province, Shandong Jiaotong University, Mechanical Engineering Institute, Qingzhou Engineering Machinery Industry Association, three, China Railway ten Bureau, in a company, China water conservancy and hydropower Sixth Engineering Bureau Co., Shandong high speed group limited company, the China Metallurgical Construction Group Limited, China Railway Construction Group, Shandong road fourteen, Shandong the Yellow River Engineering Bureau Group Co. Ltd., Ji'nan City Highway Bureau, Dezhou City Highway Bureau, Tai'an City Highway Bureau, Jining City Highway Bureau, Laiwu City Highway Bureau, Shandong WorldCom Highway Construction Co. Ltd.
Q:What is equipment manufacturing and machinery manufacturing? What's the difference between them?
Major technical equipment refers to the technical difficulty in equipment manufacturing, complete and strong, is of great significance, has a significant impact on the national economy need to be beneficial to the people's livelihood, complete sets of major technical equipment organizations across sectors, industries and regions to complete.
Q:What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ fail safe design: in the part of the system, equipment malfunction or damage, can also ensure the safety of safety and technical measures known as fault - Safety Design in a certain period of time (fail-safe). Generally speaking, through careful technical design, the system and equipment are in a low energy state when the fault occurs, thus preventing the unexpected release of energy. For example, a fuse in an electrical system is a typical fault - Safety Design; when the system is overloaded, the fuse is fused and the circuit is disconnected to ensure safety. Although the fail safe design is an effective measure of safe technology, but considering the fail safe design itself may not work due to failure, so the choice of safety technical measures should not give priority to the use of.
Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
This book is based on the characteristics of construction electrician, in accordance with the scientific, practical and applicable principles. The content is simple, the language is easy to understand, the form is illustrated, and the system, authority, operability is strong.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range