• Aluminum Dubai Type Tower Scaffolding systems System 1
  • Aluminum Dubai Type Tower Scaffolding systems System 2
Aluminum Dubai Type Tower Scaffolding systems

Aluminum Dubai Type Tower Scaffolding systems

Ref Price:
$194.00 / kg get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1.    Structure of Dubai Type Tower Scaffolding Systems

Mobile Aluminum Dubai Type Tower Scaffoldin are designed to suit the needs of the commercial building industry,mini Mobile Scaffolds are fitted with lockable safety wheels and made with a combination of cross, horizontal and diagonal braces for maximum strength and safety. This makes mobile scaffolds very safe and prevents tipping.

There are two types:  Dubai Type Tower-Narrow Tower and Dubai Type Tower-Wide Tower

 

2.Dubai Type Tower Scaffolding Systemsadvantages:

1)     Aluminum Scaffolding is lighter than Steel Scaffolding.

2)     No need surface treatment

3)     Easy to remove

 

3. Dubai Type Tower Scaffolding Systems Products pictures:

 

Aluminum Dubai Type Tower Scaffolding systems      Aluminum Dubai Type Tower Scaffolding systems

 

4. Dubai Type Tower Scaffolding Systems Specification:

 

    Technical Specifications

    Tower Type:                         

Dubai Type Tower-Wide Tower

    Length:                                  

2.5 m

    Width:                                       

1.45m

    Platform Height:                 

2.0m~6.0m

    Maximum Scaffold Height:      

7.0m

    Maximum Working Height:     

~8.0m

    Safe Working Load:                 

450kg

    Tube Material:                          

Aluminum T6061-T6

    Tube Diameter:                      

50.8mm

    Tube Wall Thickness:             

2mm

    Wheel Size:                              

8"

    Open Size:                               

4.5mx3.5m

    Platform Size:                   

2.5mx1.2m

    Platform Material:                     

Aluminum profile, Plywood decking (Non-Slip)

 

    Tower Type:                         

Dubai Type Tower-Narrow Tower

    Length:                                  

2.495 m

    Width:                                       

0.85m

    Platform Height:                 

2.0m~6.0m

    Maximum Scaffold Height:      

7.0m

    Maximum Working Height:     

~8.0m

    Safe Working Load:                 

225kg

    Tube Material:                          

Aluminum T6061-T6

    Tube Diameter:                      

50.8mm, 51.5mm

    Tube Wall Thickness:             

2mm

    Wheel Size:                              

6'' or 8"

    Open Size:                               

4.5mx2.9m

    Platform Size:                   

2.495mx0.6m

    Platform Material:                     

Aluminum profile, Plywood decking (Non-Slip)

 

 

5.FAQ

We have organized several common questions for our clients, may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

-Whole Aluminum Scaffolding

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q:As if there is mine grounding, what information do I have to do? How to do it? Thank you more
1 Gas introduction pipe shall not be laid in the bedroom, bathroom, flammable or explosive goods warehouse, corrosive media room, power room, power distribution room, substation, air conditioning room without gas, ventilation room, computer Room, cable trench, heating gutter, flue and into the air duct, garbage and other places
Q:What is the pros and cons of the cast iron engine and the aluminum alloy engine?
Air conditioning without heating the case, compared to other heating methods, the air conditioning power. When the ambient temperature is 5 degrees or more (the inverter air conditioner is slightly better and can be above ambient temperature -15 degrees) "Air conditioning is the most efficient and consumes about 1000 watts of electricity in all heating products, producing about 3000 watts of heat Power and have a better effect. "If you feel the room cool off, one hour hot and open an hour this will be more costly. Both healthy and energy-saving approach is to reduce the indoor and outdoor temperature difference. In order to set the temperature of the air conditioning, do not be higher than 20 degrees, set the best 17 degrees. Summer set air conditioning cooling temperature, neither less than 26 degrees, and not less than the indoor temperature of 3 to 6 degrees. Such as indoor temperature 30 degrees, set 27 degrees; indoor temperature 35 degrees, set 29 degrees.
Q:Made a sniper rifle total length of about 1.5 meters ~ aluminum tube to more than 400 to buy the aim of the mirror and the stent ~ gun dragged with a taste of two Bai fat paste mixed Thai aluminum alloy and screw decoration ~ no function is just a decorative model Is it illegal? More
Scaffolding in the span of 4 refers to: full of scaffolding width direction, at least 4 spans, that is, there are five pole (between the two pole between a spender for the sprinkling of the fence, Table 1.2 * 1.2 ~ 0.4 * 0.. the span is 1.2 ~ 0.4m). That is, the vertical and horizontal support frame at least 4 span.
Q:The store said that if you buy aluminum are imitation goods, is that so? Please professional answer, thank you more
Note that there is generally a middle of the waist, that is, protective railing General scaffolding step is 15 meters, there are 18 meters, it is decoration scaffolding Return to the topic, know what step is to understand the top step, is the scaffolding scaffolding the last step General cantilevered scaffolding will involve the top of the top step need to take a long pole, because there will be a pole to prevent the next layer of cantilevered arrangement So the need for short steel pipe in the top step to use long
Q:High-rise (30m and above aerial work) Building outside the scaffolding whether to conduct expert demonstration ??
To bring the purpose of fuel-efficient, faster response is also better! Cooling performance is stronger than cast iron, the other is in the disassembly of the engine, the engine cylinder pad does not need to be positive and negative!
Q:Clothes rack stainless steel is good or good aluminum
The insulation material: silicate insulation material ceramic insulation material powder polystyrene particles steel mesh mining cement foam board (Shu music board) extruded plate XPS rigid polyurethane spray coating, Foam foam board foam cement Second, the roofing material: ceramic insulation board xps extruded board EPS foam board perlite and perlite brick vermiculite and vermiculite brick hair Silicone, polystyrene foam, glass wool, rock wool four, steel materials: polystyrene, extruded board, polyurethane (PVC), polyurethane, Plate, glass wool felt and so on Five inorganic insulation material Fu Dan Dian Yu Yu Fei Dian ten East ginger material: foam cement, inorganic reactive wall insulation materials
Q:Scaffold metal fittings are good for stainless steel or aluminum
Rock wool, glass wool, soft and high fire rating, suitable for arc-shaped external wall insulation
Q:Puma skates with PP plastic stents and aluminum stents why plastic than aluminum is also expensive ah? In the end which is better? More
High level of operation at a high level of operation in the 2 - 5m, known as a high level of operation, falling range of semi - hungry view of the spring claw mill silicon Tong Hai Kun diameter R is 3m high operating height of 5m to 15m , When the height of the falling range R is 4 m high above the operating height of 15m to 30m, it is called the three-level operation, the falling radius R is 5m high when the operating height is more than 30m, Known as the extra high level operation, the falling radius R is 6m
Q:What scaffolding in interior decoration can give a construction plan? Thank you
Haier gas water heater Product Code: GD0N5100W00GJCAA. which is a production model and coding, does not represent the date. One of the joints of the gas inlet is rusted. Store in the reservoir area. Moisture may be caused by the production process. The production of the joint itself is not caused by the oxidation process.
Q:What is better for mosquito nets? (Plastic? Aluminum alloy or other)
There are many places where these things can be rented

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords