Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system
  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

 

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

 

Steel Frame Formwork GK120 with Reasonable Prices for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.  

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, 

     etc.by air/ sea, and we are VIP of these express.  

   .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7

    days.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the cost of scaffolding
Scaffolding set up the cost of the market price of about 25, different types of scaffolding used for different purposes scaffolding
Q:The Scarlet Letter Scaffold Question?
The Scarlet Letter is regularly taught at the high school level, but surely this is a mistake. The novel is difficult and challenging even for honors students. The architectured sentences, with their points and counterpoints, their parallel construction, their old school rhetorical cadences are strange and even wondrous to the modern eye. It is a good practice for the teacher and for the student to read aloud Hawthorne's prose so as to grow accustomed to his words the way one must for Shakespeare. If this is done and the edifice of Christianity and especially the fatalism of the Puritan mind brought to bear, then with leisurely pace and a steady concentration, the terrible beauty of Hawthorne's novel might be made immediate. s
Q:why did the minister visit the scaffold at night?
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q:Bowl buckle scaffold is the whole force or local force
Therefore, it has no bearing capacity and stability of the scaffolding
Q:Explain the principles of scaffolding?
I know the perfect solution if you are just starting with woodworking and also if you have already experience with it. I reccomend to give a look to this website ( woodworkingplans.kyma.info ) You can find a lot of woodworking plans and you will be able to manage the projects with a CAD/DWG software. It allows you to modify the projects and to alter the arragements. If you are a beginner this is the easiest way to start, it's the best approach to woodworking; and if you already have experience you will find a lot of ideas and inspirations to improve your abilities with woodwork. I'm sure that you will love it!
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from?
85kg. is 42.5kg each cable. 6.4/1.4 = 4.571:1 ratio. Add both sides. (440/5.571) x 4.571 = 361kg. Add the 42.5, = 403.52kg. 403.52 x 9.8 = 3,954.5N tension in left cable.
Q:What is the difference between the bowl buckle scaffold and the fastener scaffold?
Scaffolding classificationScaffolding is a temporary structure frame for the construction, installation and construction of materials, materials and construction operations.1 according to the materials used: divided into wooden scaffolding, steel scaffolding and ladders.2 according to whether it can be moved: divided into mobile scaffolding and fixed scaffolding.3 according to the nature of the construction: divided into construction scaffolding and installation scaffolding.4 according to the form and use of the overlap into
Q:Standard Specification for bowl type scaffold steel pipe diameter
Span and step distance is in accordance with the relevant regulations; the top of the free end is more than the specifications is not greater than 50cm, and free from backwater not greater than 30cm
Q:For engineering scaffolding steel pipe all kinds of fasteners and fastening screws calculation method?
For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range