Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1500 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Cup lock scaffold is a new steel pipe scaffold of spigot joint. Scaffolding has the toothed bowl joint, it has the features of installation demolition rapidly and saving the energy, stable and reliable structure, the perfect equipped, widely using, large bearing capacity, safe and reliable, easy to machine, but not easily lost, easy to manage, easy to transport, etc, the working efficiency is improved highly.

  • Component: Standard, Ledger,Strengthened ledger, Transom Beam,Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.


2. The Advantages of Cup-lock Scaffolding:

  • Highly durable

  • Multifunction:

    According to the specific construction requirements, it can be installed the construction equipment which contains different groups of size, shape and bearing capacity of single and double row scaffolding, shoring prop, material hoisting frame, climbing scaffolding, cantilever rack and other functions of construction equipment..

  • Efficient:

    Avoid to use the nut to operate, the speed of installation and dismantle is faster 3 to 5 times than common, workers use a hammer to complete all assignments.

  • Strength bearing capacity: Stable and reliable structure, strength bearing capacity.

 

 

3. Images for Cup-lock Scaffolding:

 

 

Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel


Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel

 

 

 4. FAQ

 

  • How to guarantee the quality of the products?.

  Our scaffold products mainly include: Kwik-stage System Scaffold, All-round System Scaffold, Cup-lock System Scaffold,   

  Frames Scaffold, Shoring System Scaffold, Aluminum Scaffold, Scaffold Accessories. Our Formwork products mainly  

  range: Standard Flat Formwork, Column Formwork, Special Formwork for Bridges/Highways/Tunnels.
  Scaffold products are widely exported to North America, South America, Europe, Australia, New Zealand, Africa, Mid- 

  east Region, South-east Asia, Japan, Korea, Hong Kong, Macao, etc. We have set up our warehouses in Los Angles,

  USA.


  • Packing & Delivery Term?

    Export standerd package or as customer's requirements.

  • Delivery Detail:

    10-25 days after receipt of payment.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Wankou scaffolding steel scaffolding and look like? What's the difference?
Each node of the bowl buckle scaffold is made of a button which is shaped like a bowl, and the frame body is built
Q:why did the minister visit the scaffold at night?
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q:What is scaffolding in ESL?
A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.
Q:How can teachers use scaffolding?
You need to relate new class knowledge to old knowledge, and also make learning materials for new activities highly structured, and gradually less structured as you move through the topic.
Q:Pankou galvanized scaffolding is very beautiful, I would like to ask the material and the characteristics of this shelf
Socket type plate type scaffold is composed of a vertical rod, bar, diagonal, adjustable base and adjustable bracket and other parts constitute. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 60*3.25mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.50m welding on a disc, rail connection using this novel and beautiful disc, and the oblique rod. The cross bar is made of a cast plug with a wedge-shaped bolt welded on both ends of the steel pipe. The bottom of the steel pipe is a diagonal rod casting head with a wedge bolt after punching and punching the two ends of the steel pipe. It has two obvious advantages, one is the maximum to prevent the traditional scaffolding activities of spare parts easily lost, easily damaged, reduce construction unit economic losses; two is no movable locking member, no security risks maximally prevent the traditional scaffolding caused by movable locking member.
Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q:I can get a scaffold piercing bar out of my ear HELP!?
Try wearing latex gloves (if you aren't allergic to latex.) This can hep you get a grip on the ends. You can go to your piercer and they will help you take it out. If you don't want to lose the piercing altogether, you can ask them to put small rings in it. This should ease and pressure and discomfort you are having.
Q:Do scaffold piercings hurt?
Yes. It like someone pinching you for a short period of time
Q:i worked a week in hand for a scaffold company and got laid off 2 months later only got 1 weeks pay?
Well if after 2 weeks you still hadn't been paid, then you should of left and found another job. I did door work for Scottish power years ago - trying to gain new energy customers etc. They didn't pay me or my colleagues at all. Eventually 3 months later I got £350 out of them - Only after I wrote directly to the Chief executive (Rather handy that they accidentally sent me to his own home to try and sell him gas electricity hehehe). I wrote directly to his home and needless to say he took it upon himself personally to look into plus I also got a personal response.
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range