360 Degree Swivel Coupler British Type for Sale

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

360 Degree Swivel Coupler British Type for Sale


Description


1.The scaffolding coupler is always used to connect the steel pipe as scaffolding system.

2.The often used coupler is swivel coupler and righ angle coupler .

3.We can provide types of scaffolding coupler according to your requirement.

4.Couoler can fix the 48.3mm scaffolding steel pipe tightly and make the whole scaffolding system more steadily.

5.Material:Q235 steel

6.Overall Size:48.3mm*48.3mm

7.Surface Finish: Galvanized/ Painted

8.Standard:BS1139,EN74

9.Package:25pcs/bag

10.Manufactuering as per customer requirements

360 Degree Swivel Coupler British Type for Sale


Feature


(1)Excellent Anti-Breaking—Cold Pressed Steel

(2)Outstanding Resistance Deformation

(3)Strong Anti-Dropping Ability

(4)Longtime USe

(5)Qualtity Guaranteed

(6)OEM Service



Photo


360 Degree Swivel Coupler British Type for Sale

360 Degree Swivel Coupler British Type for Sale

360 Degree Swivel Coupler British Type for Sale

Parameter



MaterialQ235,345steel
Size48.3mm*48.3mm
Surface finishGalvanized
Weight1.1kg around
StandardBS1139,EN74
Package25pcs/bag,steel pallet
Manufacture
As per customer requirement
MarketAfrica, South America, the Middle East and Asia



FAQ


Q: Are you a factory or trading company?    

We are a state-owned corporation in China,dealing with various kinds of building materials.We have our holding subsidiaries.

Q: Where is your factory located? How can I visit there?    

Our factory is located all around China.

Q: Can I get some samples?    

Sample is free, customer only pay freight for the first time. 

Q: Delivery?

10-30days. (5-15 containers)



Any question,feel free to contact us.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Novice scaffolding erection, steel banding, template installation, concrete pouring common problems and precautions!
EPS foam for the expansion and XPS extrusion continuity of two, compared with the EPS sheet, XPS board is the first quarter of the side of the side of the road, from it to overcome the complex production process EPS board and EPS board can not replace the superior performance of the process
Q:I would like to download the technical specifications for the construction of fasteners for steel construction scaffolding
There are requirements, the specific look at the drawings design, such as the use of 12J3-1 Atlas requirements as shown in Figure.
Q:On the scaffolding sweeping pole, vertical and horizontal and vertical cross on the issue of conflict.
More than 24 meters need to use cantilevered scaffolding, and the spacing of not more than 20 meters
Q:My mom is making me choose between and industrial/ scaffold ear piercing or a six pack of contacts?
Get the contacts. It's better to see clearly without glasses bouncing around on your face than to have a piece of metal shoved through your ear. And no, I'm not against piercings, I have a few. But your eyes are more important than a piercing.
Q:What are the loads that can be sustained by the construction of fasteners?
Look at the cold water tower of the chemical plant and inspire you.
Q:will a steel scaffold coupler with bolted on chains sunk into concrete be a good?
May be cheaper and a lot less trouble to get theft insurance.
Q:how long do scaffolding piercings take to heal?
Get it done next summer. Scaffolding piecing can taking anywhere from 6 months to a year to fully heal. If its school your worrying about, ever though about getting the piercing with a clear barbell? Like a glass one?
Q:Who has a scaffolding new specification construction construction fastener type steel scaffolding safety technical specification JGJ130-2011. The The E-mail 1120857471@qq.com .. The The
Can not. I said buddy, you do not think about this thing, or think about how to do business it
Q:A 115 kg scaffold is 6 m long. It is hanging with two wires, one from each end. A 540 kg box sits 1.8 m fro?
this is a torque question with two unknowns i.e. the two tension forces in the wires. to find the tension in the right one, let the pivot point be at the connection of the wire (the left one) and the scaffold. Then the following calculation: let T=tension in right wire r=the lever arm length the angle is 90 so no need to worry about the angle as sin90=1 sum of the anticlockwise moments=sum of the clockwise moments 6T=540x9.8x1.8+3x115x9.8 T=2151.1N (upwards) draw a diagram it helps you to see the question more clearly
Q:What are the site safety regulations for building safety management?
After finishing the roof leveling, listen to the weather forecast, in the forecast of 3-4 days of good weather in the case of continuous roof waterproof construction, inspection and timely protection of the construction layer

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range