• Wholly Aluminum Formwork With Perfect Design and Better Welding System 1
  • Wholly Aluminum Formwork With Perfect Design and Better Welding System 2
  • Wholly Aluminum Formwork With Perfect Design and Better Welding System 3
  • Wholly Aluminum Formwork With Perfect Design and Better Welding System 4
  • Wholly Aluminum Formwork With Perfect Design and Better Welding System 5
  • Wholly Aluminum Formwork With Perfect Design and Better Welding System 6
Wholly Aluminum Formwork With Perfect Design and Better Welding

Wholly Aluminum Formwork With Perfect Design and Better Welding

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
150 m²
Supply Capability:
60000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Aluminum Form Work Brief Introduction : 

Aluminum Formwork is widely used in highway,railway,bridge,tunnel and shearing wall,etc. It is with light weight and smooth for surface concrete and popular in constructions .

 

2.Characteristic for Wholly Steel Formwork :

   1) High Smooth Surface

   2) Convex ling for Edge Rib

   3) Specialized Connection Pin for Edge Rib Connection

   4) High Stiffness for Aluminum Surface

   5) Light Weight for saving producing cost

   6) Fast Separate and Easy transport

   7) Recycling using

 

3. Aluminum Formwork Specifications:

    1) Maximum Column Size:900 x 900mm   (2’-11.5”x 2’-11.5”)

    2) Design Concrete Pressure: 1,800 psf (90 kN/m2)

    3) Standard Panel Width 900mm, 750mm & 600mm  (2’-11.5”,2’-5.5” & 1’-11.5”)

    4)Standard Panel Height: 3.0m, 2.4m, 1.2m

 

4. Factor & Product Photos :

 

Wholly Aluminum Formwork With Perfect Design and Better Welding

 

Wholly Aluminum Formwork With Perfect Design and Better Welding

 

Wholly Aluminum Formwork With Perfect Design and Better Welding

 

Wholly Aluminum Formwork With Perfect Design and Better Welding

 

Wholly Aluminum Formwork With Perfect Design and Better Welding

 

5. FAQ

1) What is the payment terms in our Company ?

Generally TT, LC At Sight, West Union , Moneygram . Besides , we can accept LC After Sight , DP etc.

2) Packing For Aluminum Formwork.

Nude or Pallet for Big Formwork and the Accessaries in PP bags.

3) Quality Guarantee

We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .

4) After Sales Service

We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .

5) Time of Delivery

We can overdo work for the customer to make sure the fast shipment



 

Q:What is the change in the aluminum template?
Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
Q:Now the domestic use of aluminum template project more?
1, the construction period is short 2, can be reused many times, the cost of compression costs 3, the construction is convenient, high efficiency, easy to install 4, good stability, high bearing capacity, environmental protection, energy saving,
Q:In the Sheng-aluminum template installation workers, how to develop prospects
Sheng Tong on my feeling is the same as prison, in addition to front-line staff (prisoners), what is the leadership (guards), every day is the workshop, dormitory, dinner time is only half an hour, the company provides working hours if 12 hours, The time to stay in the workshop every day in more than 13 hours, especially hard to force, can not stand the tube, temper a little irritable advice do not go, afraid you can not control their own K
Q:What is the development prospect of aluminum template design?
Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
Q:Whether a shear wall aluminum template and wood template can be mixed
Mixed with the two kinds of templates will be fixed in different ways, the construction of the security caused a certain impact; intersecting joints prone to the wrong layer and honeycomb; two templates expansion coefficient, strength, water retention will not cause the same shear Wall as a whole;
Q:Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords