PRODUCT NAME:Mobile Aluminium Work Platform dual mast GTWY series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
This elevating work platform is CE certified.
It is mainly used for indoor or outdoor aerial works in road and bridge construction, power industry,
airports, exhibition halls, communications, etc.
1KG=2.2LB 1INCH=25.4MM
Model | GTWY6-2000 | GTWY8-2000 | GTWY10-2000 | GTWY12-2000 | |
Safe working load | kg | 300 | 250 | 200 | |
Maximum working height | mm | 8000 | 10000 | 12000 | 14000 |
Maximum platform height | mm | 6000 | 8000 | 10000 | 12000 |
Overall length | mm | 1560 | 1790 | ||
Overall width | mm | 840 | 890 | ||
Overall height | mm | 1810 | 2030 | ||
Working platform size | mm | 1210X600 | 1450X600 | ||
Minimum ground clearance | mm | 800 | |||
Wheelbase | mm | 1170 | 1420 | ||
Lifting motor | kw | 110-230VAC/1.5KW or 12VDC/2.5KW | |||
Lifting/ descending speed | mm | 58/40sec | 62/43sec | 70/46sec | 75/54sec |
Accumulator | 2x12V/150Ah | ||||
Charger | 12V/15A | ||||
Rear wheel | mm | 200x50 | |||
Front wheel | mm | 180x50 | |||
Overall weight | kg | 570 | 630 | 730 | 825 |
Standard Configuration
-Emergency stop button
-limit switch
-Emergency descending button
-Dual controller
-Level indicator
-Overload limit
-Adjustable supporter
-Charger lamp
- Q: I wanna go into the woodwool or wood shredder manufacturing...plz tell where the machinery can b bought from? second hand m/c will also work........thnx a tonnn
- May know were an old one is. Are you in US?
- Q: If anyone know supplier of Hydraulic Machinery and equipments in India then please reply me urgently.
- Hi okorder /
- Q: heavy machinery like a bulldozer - construction equipment
- A license to kill.
- Q: I am looking export kubota brand various combine Harvester to Veitnammarket which good for Rice Harvest but i dont find any information on net or else for find suitable buyer, client those required these kinds of Combine Harvester how can i find pls Help?
- Why? Most can't afford it anyway. Call Kubota if you really want to pursue this and have money to pay for the equipment.
- Q: Is there more machinery of gov't than is necessary, too many parasites living on the labor of the industrious?
- There are too many people to be USED by any machinery. Since we are not USEFUL- we do not need to be fed.
- Q: Please, help me with this question.I don't understand what machinery was like DURING and AFTER urbanisation and industrialization in Canada.Please help!Thank-you so much, and take care!
- looms, ploughs, bicycles, carts, hammers, pulleys etc. and kinda things..
- Q: Question about jounal entry Purchased a machinery I have to affect this entry on purchase a/c as well as fixed assets also I want to take tax set off, How can I ?suppose I pass purchase entryParty / Purchase Dr. (Creditor)To Machinery Net 4% cr.(Purchase)To Vat 4% cr.(Duties Taxes) Fixed asset machinery Machinery a/c dr. (fixed assets)To party/ or purchase or what ?
- Well you are not very clear with your question , you need to be clear about what you are trying to do, Did you receive an invoice for the fixed asset or the payment has already been made ? answer would depend on the situation: Although i think the main entry you are after is DR Fixed assets ( machinery) DR VAT paid- (assuming ur subledger doesnt pick up any VAT) CR Trade creditors this would be the main journal, in between these journals you could have as many journals as you want in between. Hope this helped.
- Q: how to depreciate machinery by using weighted average?
- It really depends on how you want it weighted. If you have the original value of your capital asset, your variable depreciation ratio based on the data for the weighted average, and the time period, it's really just a matter of calculation. Can you be more specific with your question?
- Q: I'm trying to get a quote on shipping a heavy sand blaster from New York to Oregon, but I'm can't figure out what this freight class is that I'm being asked for. Thanks
- I've okorder /
- Q: Bally Manufacturing sent Intel Corporation an invoice for machinery with a $20,000 list price. Bally dated the invoice July 23 with 2/10 EOM terms. Intel receives a 40% trade discount. Intel pays the invoice on August 5.
- Yeah, so what's the question really? (You don't really state what you want answered). But anyways, Intel missed the 10 day discount period on the payment terms, so they can't take that. ------------------------ It's also hard to tell if the trade discount is already included in the invoice amount (which it should be).
Send your message to us
PRODUCT NAME:Mobile Aluminium Work Platform dual mast GTWY series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords