Double/Single-Layer Board Smd Led Christmas Lighting
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 10000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Christmas lighting Double/single-layer board christmas lights
Christmas lighting : christmas lighting is the straight tube serial, used especial LED meteor for decoration. When it is on, the light looks like meteors coming across the sky, because of this light effect, it is named meteor light.
LED meteor light GS-3528-80-78 Double -board
Applications
Governmental lighting projects; decoration for buildings, streets, gardens, rivers, trees, hotels, shopping malls, night scene, and various kinds of places of interest and places of entertainment.
Product Advantage:
1.Energy saving, environmental,Eco-friendly
2. Fashion design and different types
3. Easy to install and use
4. ROHS and CE approved
Company Advantage:
1. Delivery on time
2. Supply OEM,ODM service
3. All the shape,size,color,brightness is available here
4. We supply technical support ,so you can call our engineer anytime
5. All our products have over 1 years warranty
6. Protection of your design and all your private information.
Remarked:
1.Logo: (Can accept your own logo)
2.Packaging: 1pc /gift box/white mail order box
3.Shipping: By Expre ss(EMS,DHL,UPS,ARAMEX), By Air or By Sea
4. The price is much more flexible and it completely depends on the quantity you need.
5. Please kindly check and revert at your earlist! samples will be sent on request.
Comments please, any questions will be appreciated!
Product Show:
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
Factory:
- Q: What are the main technical measures for the implementation of energy-saving lighting?
- But in the place with higher color rendering requirements, rare earth energy-saving fluorescent lamp, three primary fluorescent lamp, small power high color display sodium lamp and other light sources should be adopted.
- Q: What is outdoor theme lighting?
- The night sky rainbow is professionally done. Have time to get to know it
- Q: Building lighting in lighting, lighting should pay attention to what details?
- Building lighting needs to consider the problem, should choose the appropriate lamps and lanterns lighting, in general, square light distribution angle is larger, round lamp angle is smaller.
- Q: Lighting line connections?
- Series circuit: a circuit consisting of elements connected sequentially.
- Q: Do you want city lighting?
- . If you want to do lighting to simply provide people with visual convenience at night, it is really a waste of energy, no need to bother to do city lighting, street lamp is enough
- Q: What is lighting energy-saving?
- Therefore, it is imperative to actively promote energy-saving lighting.
- Q: What are festivals fireworks?
- In life, at certain times (such as the new year), enjoy the victory of the moment, or happy day, people will set off "fireworks", to express people's blessings and joy.
- Q: What are the energy saving measures for lighting and distribution?
- the office, the computer room, the control room, the shop, the dining room, the guest room and the bathroom mirror lamp and so on should use the straight tube lamp, the decoration request high place may use the compact fluorescent lamp (hereinafter called CFL)
- Q: Energy saving of urban lighting
- The focus of urban lighting energy-saving work is urban nightscape lighting. A) implement a single project in accordance with the overall urban lighting plan
- Q: What are the main points of power distribution and lighting energy-saving supervision?
- verification of thermal insulation materials used for curtain wall energy saving projects, the thermal conductivity, density and combustion performance shall comply with the design requirements.
Send your message to us
Double/Single-Layer Board Smd Led Christmas Lighting
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 10000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches