A Cable Separable Connector Type Plug

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

RU 200 A 15, 25, and 35 kV Loadbreak Elbow Connectors and Accessories are submersible, fully-shielded and insulated plug-in terminations, ideal for connecting underground cable to transformes, switchgear, sectionalizing cabinets and junctions. These connectors are molded using high-quality, peroxide-cured EPDM insulation for reliable field performance.

15 kV and 25 kV loadbreak elbows are available with an integral jacket seal for use with concentric neutral and other types of shielded cables.

All 200 A loadbreak connectors meet the electrical, mechanical, and dimensional requirements of IEEE Std 386™ standard and are designed to be fully interchangeable with other major manufacturers currently complying with IEEE Std 386™ standard.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Buy Taipower c 450P with remote control to add audio and video cable
And I answered the other person's question is very similar: . the line of the banding distance of not more than 1.2 meters, the two ends of the wire box outlet tube 15CM should be ligation; . casing embedded, then through the basement wall, the surface must be installed rigid Waterproof casing, that is, steel pipe + water ring; through the fire pool, living pool: flexible waterproof casing; (wing ring specific practices can be collected online related Atlas); through the floor, according to whether the design requirements , Under normal circumstances PVC casing on it. Note: . rigid waterproof casing, flexible waterproof casing is a one-time reserved in place, through the floor of the casing of the flower lamb to suppress the barge of Xi Jie Xi Xi shou, is the first stay hole, when the installation of riser Casing, because the floor casing has every layer, the location of the reservation will always be biased, in order to ensure vertical vertical pipe, and finally unified hanging line repair hole and then install the riser and casing. . now most of the bathroom are dirty, waste and diversion, and more of the riser, and so on, the air conditioning casing of all the shear wall should be embedded, to avoid the subsequent damage to the structure of drilling (no stay can only drill) Note that the location of the hole and the installation of the riser will affect the opening of the toilet window. . the casing is the casing, riser is the riser, casing than the riser model 1 to 2 level. . plate at the end of flat, board 2 to 5CM higher to see if you need to do leveling layer.
Q:Now the market professional installation monitoring the construction team how much money a point? , As well as cable patch panels and telephone patch panels how much money a point? Is it distance?
Directly to find Dell customer service bar, the general warranty period are free replacement, unless the insurance of the. You can extend the warranty period, it seems you like to do the experiment.
Q:The computer can not open the machine display frequency beyond the scope of the mouse and keyboard do not start can not press F8 how to do
Then you get the repair station to see what is the problem
Q:When pouring concrete is how to put the tube
Oh, the pipeline is poured before the layout according to the design drawings.
Q:Connect the computer to the TV. The The Using the HDMI cable. The The Line no problem. The Why not even after the audio video. The The Amplifier is Denon 1311
BV1 * 2.5 is a 2.5 square line. 2 * 2.5 is two 2.5 square lines. 3 * 2.5 is three 2.5 square lines. 4 * 2.5 is the 4 2.5 square line lighting wire power cord with 2 * 2.5. Light wire with 1.5 is enough. Socket (pipe) with three 2.5 square lines, you can also use 3 * 2.5 a. 4 * 2.5 for three-phase motors.
Q:Is there a difference between PE cable and PE water supply pipe?
The color is easy to distinguish. General yellow on behalf of the video line, red white plug left and right audio.
Q:What is the difference between a kbg threading pipe and a PVC threading pipe?
The expression is not very clear, it should be said to wear a tube, if a single wear on the line 100. Outside diameter 60mm.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:Cable YJV-3 * 70 + 2 * 35 general wear large SC tube? Ask you.
Yes, it is more conducive to the protection of the battery, but if no power out of power, the data can not be saved ah, and you have to put the battery on a regular charge
Q:What does the letter of the computer cable model mean?
Cable regardless of the definition of the number of elements in the definition of a few such as: YJV-3 * 50 + 1 * 16 calculated the number of lines is always a different, different wire rules Model input: bv-2 * 2.5 / bv-3 * 4 (different material), bv-2 * 2.5 + 3 * 4 (the same material)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range