Timber Beam Formwork with H20 Beam, High Quality

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
10000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Timber Beam Formwork with H20 Beam, High Quality

Timber Beam Formwork with H20 Beam, High Quality

Timber Beam Formwork with H20 Beam, High Quality

Timber Beam Formwork with H20 Beam, High Quality

Timber Beam Formwork with H20 Beam, High Quality

Timber Beam Formwork with H20 Beam, High Quality

1. Structure of Timber-beam Formwork Description

Timber-beam Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system

 

2. Main Features of Timber-beam Formwork

-convenient for construction

-easy to control the quality

-easy, rapid and economical.


3. Timber-beam Formwork Images


4. Timber Beam Column Formwork Specifications

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5. FAQ of Timber Beam Formwork

1) What can we do for you?

We can ensure the quality of the Timber-beam  Formwork and avoid extra expenses for customers.

We can provide you the professional technical team.

We can provide professional building proposal for your projects.

 

2) What promises can be done by us?

If interested in this kind of formwork, please feel free to write us for any QUOTE.

If need any technical and building assistance, we could provide on-site professional staff for instruction.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale services?

Response will be carried out  in 24hours after receiving any complain or request.

Any formwork cost can be refund after order is confirmed.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q:What are the world famous mechanical equipment exhibition?
3, the French international civil engineering and Construction Machinery Exhibition (INTERMAT) the European Construction Committee (CECE), founded in 1988, tenth in 2015, is one of the three famous exhibition of world engineering machinery and construction machinery field, three years. France INTERMAT exhibition exhibits covering mining machinery, earthmoving machinery, concrete machinery, lifting machinery, pavement and compaction machinery, piling machinery, industrial vehicles, pneumatic tools, drilling machinery, building materials machinery, mining machinery and other engineering and construction machinery and spare parts industry. Paris International Construction Machinery Exhibition in Europe - the Middle East - Africa (EMEA) region has a unique position.
Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
Q:Construction machinery production need to deal with what documents?
Two, enterprise legal person business license (copy), with enterprise legal person business license duplicate copy, search three, all levels of safety production responsibility system and safety production rules and regulations directory and documents, operation procedures directory
Q:What is a door rack for a construction site? How high is it generally?
Construction machinery network learned that the door scaffolding in our country production and use of time is not long, the scaffolding developed by the various research institutions, self-contained, and not common, varieties, specifications and diverse. Some factories copy foreign products and use the imperial size.
Q:Changsha Sanlian Building Machinery Fittings Factory
In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
The distribution of the construction site, construction machinery and electric hand-held electric tools, lighting, construction site construction site: risk factors and lightning protection, the construction site of common electrical tools and instruments, the construction site of the electricity management, common electrical fault, accidents and accident cases.
Q:What is the use of spare parts prices in Chinese market by foreign companies?
You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range