Shipboard communication cable-CHJPF86 SC

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000 km m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Standards: IEC 60092-350, IEC60092-376, IEC 60332-1-2, IEC 60332-3-22,IEC 60754-1/2, IEC 61034


Application: The cable is used onships, petrol platforms and offshore buildings for telecommunication,instrumentation and information proceeding system.




Cable marketing: CMCW(CMC) type size IEC 60332-3-22 length

Core identification: Pair white-blue + black printed number


Certificates: CSS(China), LR(UK), GL(Germany), BV(France), ABS(USA), DNV(Norway), NK(Japan), KR(Korea), VDE(Germany) and TUV(Germany).




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The computer can not open the machine display frequency beyond the scope of the mouse and keyboard do not start can not press F8 how to do
Several sets of cables in the same height of the laying, the adjacent cable between the bridge should be considered maintenance, maintenance needs, generally not less than 0.6m. This is just a matter of theory, it does not matter. Anyway, the actual construction is to do so,
Q:When pouring concrete is how to put the tube
Oh, the pipeline is poured before the layout according to the design drawings.
Q:Galvanized wire tube buried to do anti - corrosion do
Galvanized itself on the anti-corrosion, no need to do anti-corrosion treatment.
Q:Connect the computer to the TV. The The Using the HDMI cable. The The Line no problem. The Why not even after the audio video. The The Amplifier is Denon 1311
Make a mark, such as red set into the bottom for a color in a layer, or you can draw a few plans, water and electricity is a strong power is a weak and one, the label can do a good job
Q:2.5 square copper (green, with the threading tube) can withstand the highest power of several kilowatts,
Replaced with 30 * 30 PVC flameproof trough, side wiring side cover.
Q:What kind of KVM switch is this configuration below?
Hello according to your request can be used two sets of ordinary 16 cascade, to a control terminal control 32 hosts. Is the cheapest solution. According to my understanding of the domestic Haikang series of products cost-effective, you can understand the next.
Q:How are various wire and cable models named?
Cable type a lot, here to give an example: ZRC-YJV22-0.6 / 1KV3 * 25 +2 * 16 This model specification means: C-class flame retardant (ZRC) XLPE insulated (YJ) PVC jacket 22) steel tape armor (0.6 / 1KV) 0.6 / 1 kV (3 * 25) 3 25 square (+ 1 * 16) plus two 16 square copper conductor flame retardant copper core steel tape armored cross-linked poly Ethylene insulated PVC sheathed low voltage electric power.
Q:Home leaked, installed in the floor below the wire was blisters will have any security risks? How can the water inside the pipe to dry
Cable is a unified call, including power cables, communication cables, etc., I do not know what type of cable you need the type specifications. On the power cable in terms of the main models are: VV, BJV, VV. BJV. . ZR, NH and other models, as the specifications that too much.
Q:Help look at such a configuration will not have compatibility issues! Do you need to improve? Budget in 5500 or so
What do you want to do? Do network cabling buried? Or in the building after the tube?
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range