Steel Wire For Armouring Cable

Ref Price:
$800.00 / m.t.
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5mts m.t.
Supply Capability:
3000mt/Month m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Packaging & Delivery of Steel Wire For Armouring Cable

Packaging Detail : In standard Packing

Delivery Detail : 25-30days 

 

Specifications of Steel Wire For Armouring Cable

1.professional manufacture

2.CE,RoHs certificate

3.free samples

4.fast delivery

cable tie mount

 

Material of Steel Wire For Armouring Cable

Nylon 66,94v-2,certificated by UL.Acid and corrode resisting,insulate,not to age,with imported double sided tape on the back.

how to use:

remove the cover of the adhensive and stick the piece properly,then put in cable tie for using.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the toilet wire walk on the ground? Are there any hidden dangers?
Budget 1W5 requires the whole machine to include the display of the monitor not too big too much Not used to more
Q:When pouring concrete is how to put the tube
Line pipe is poured before the concrete is laid on the cloth, fixed on the template or steel, pouring a need to install a class at any time to adjust its position!
Q:Galvanized wire tube buried to do anti - corrosion do
Galvanized pipe itself with anti-corrosion coating, you can not do anti-corrosion.
Q:Connect the computer to the TV. The The Using the HDMI cable. The The Line no problem. The Why not even after the audio video. The The Amplifier is Denon 1311
BV1 * 2.5 is a 2.5 square line. 2 * 2.5 is two 2.5 square lines. 3 * 2.5 is three 2.5 square lines. 4 * 2.5 is the 4 2.5 square line lighting wire power cord with 2 * 2.5. Light wire with 1.5 is enough. Socket (pipe) with three 2.5 square lines, you can also use 3 * 2.5 a. 4 * 2.5 for three-phase motors.
Q:What kind of KVM switch is this configuration below?
Hello according to your request can be used two sets of ordinary 16 cascade, to a control terminal control 32 hosts. Is the cheapest solution. According to my understanding of the domestic Haikang series of products cost-effective, you can understand the next.
Q:Home wiring is a good line or a good line? Talk about the difference
This approach is a lot of the general is to extend the city line, that is, line 220V AC line lengthened, some in Taobao. 2. to extend the low-voltage line, engage in a power plug on the plug, the same set of seats, you can easily do an extension line, when you want to use, docking about it, when you can not close up. This is also on Taobao, when to buy, pay attention to the socket, plug the model to the on.
Q:What is the difference between wires and cables?
The introduction of the device is to introduce the cable into the electrical equipment, without changing the explosion-proof type of explosion-proof equipment
Q:How to distinguish between power cables and electrical wiring on drawings
After the opening is not, if not open like a downstairs to delete the C disk file on the line, if the boot is necessary to set up, sit down little hands and feet.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:A five-hole dual-socket how to connect the wiring, the electrician line to go three lines, the switch can use a single socket did not take their own hands
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated

1. Manufacturer Overview

Location Beijing, China
Year Established 2002
Annual Output Value Below US$1 Million
Main Markets Southeast Asia;Mid East; Domestic Market
Company Certifications ISO9001-2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Tianjin
Export Percentage 1% - 10%
No.of Employees in Trade Department 50 People
Language Spoken: English; Chinese
b)Factory Information  
Factory Size: Above 30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range High; Average