Rubber Piston DN205,DN225MM for Mitsubish Pump

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Product Description:

Product Name: 

 Rubber Piston DN205,DN225MM for Mitsubish Pump

 

Name

Concrete Pump Piston

Size

SCHWING: DN180/200/230/250

PM : DN180/200/230/250

KYOKUTO: DN230/225/205

CIFA: DN178/DN200/DN230

ELBA: DN200/230

ZOOMLION: DN180/200/220/230

SANY: DN180/195/200/230/260/280

Other sizes and types upon customer’s requirement.

Material

Polyurethane,Natural rubber

Application

Used in concrete pump

Service

Brand

Schwing, PM, Kyokuto, CIFA , Zoomlion, Sany, and so on

2.  Application

Our  Rubber Piston DN205,DN225MM for Mitsubish Pump have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

3.  Package

Every  Rubber Piston DN205,DN225MM for Mitsubish Pump put in one seaworthy wooden box, in one 20feet container.

 

FAQ:

Q1: Why buy Materials & Equipment from us?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Rubber Piston DN205,DN225MM for Mitsubish according to customers request?

A4: Yes, we can produce Rubber Piston DN205,DN225MM for Mitsubish according to the difference country situations and different concrete  pump to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:We have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 

 

 

 

Rubber Piston DN205,DN225MM for Mitsubish Pump Rubber Piston DN205,DN225MM for Mitsubish Pump

 

Rubber Piston DN205,DN225MM for Mitsubish Pump Rubber Piston DN205,DN225MM for Mitsubish Pump

 

Rubber Piston DN205,DN225MM for Mitsubish PumpRubber Piston DN205,DN225MM for Mitsubish Pump

 

 

Rubber Piston DN205,DN225MM for Mitsubish PumpRubber Piston DN205,DN225MM for Mitsubish Pump

 

Rubber Piston DN205,DN225MM for Mitsubish Pump

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:Where are the mechanical pressurization air supply facilities set up?
When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
Q:What are the main functions of construction equipment monitoring system?
This belongs to information management engineering. The control part is the "heart" and "brain" of the whole system. It is the command center to realize the function of the whole system. The control part is mainly composed of the main console (some systems also have a secondary console). The main function of the total console: video signal amplification and signal distribution, image correction and compensation, image signal and image signal (including switching or voice signals) record, cameras and auxiliary components (such as camera, PTZ, shield) control (remote control) and so on.
Q:What type of industry does the machinery and building accessories processing belong to?
There are only three tax categories in our country: 1 consumption tax, 2 VAT, 3 special tax (agriculture). Therefore, as long as the manufacturing or processing of industrial value added tax on enterprises. It has nothing to do with the economic nature, classification and categories of an enterprise.
Q:What functions should be achieved in mechanical structure design?
Mechanical structure design plays an important role in mechanical design. This chapter mainly discusses the characteristics, steps and mode of thinking of mechanical structure design. The working principle and design requirements of the machine assembly is a major factor in determining the structure and shape of the parts, followed by the selection of materials, manufacturing process requirements, which has the advantages of good manufacturability (processing and assembly). In addition, the perfection of the structure and shape of the parts has a great influence on the strength and stiffness.
Q:Changsha Sanlian Building Machinery Fittings Factory
The company in Changsha Hongdun business online can not find, provided by his address: two Changsha section of Xingsha Economic Development Zone Yuan Ming Road, I checked 114 specially call 12580 to booking the hotel near the road, not the road. Definitely a liar.
Q:What kind of electrical equipment do you have? What are the main components of each device?
Electrical equipment, electrical parts, electrical equipment, electrical components: mainly refers to other construction equipment matching, power driven, electrical heating, electrical lighting, and other direct consumption of electricity and into other parts of energy. Such as: motor and electric heater and start control equipment, decorative lighting lamps and the switch socket, television communication and intelligent engineering for power supply and transformation or environmental protection dust and kitchen fume and other special DC power supply etc.
Q:What are the sectors of machine building and parts processing?
Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
This book is based on the characteristics of construction electrician, in accordance with the scientific, practical and applicable principles. The content is simple, the language is easy to understand, the form is illustrated, and the system, authority, operability is strong.
Q:What is the difference and connection between equipment manufacturing and machine building?
In accordance with the standards of classification, including metal products, general machinery manufacturing, machinery manufacturing, transportation equipment manufacturing, electronic and communication equipment manufacturing industry, electrical machinery and equipment manufacturing, instrumentation and office machinery manufacturing seven deducted 186 small consumer related manufacturing industry after class. Equivalent to the European countries referred to as "capital goods manufacturing", that is, we often say "the production of means of production industry."".

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range