PP-R mini ball valve with brass ball

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Brand: SPT Standard: ISO9001 Color: White&Green&Grey

Product Description:

Picture:


PP-R  mini  ball  valve  with brass ball

PP-R  mini  ball  valve  with brass ball

Product Applications:

Distribution for cool and hot water
Duct for drinkable water system
Pipes for kinds of high-temperature and low-temperature heating system
Pipes for heating and coolling settings in solar energy system
Connecting pipe for air conditioners

 

Product Advantages:

1) Healthy, bacteriological neutral, conforming to drinking water standards
2) Resistant to high temperatures, good impact strength

3) Convenient and reliable installation, low construction expenses
4) Excellent heat-insulation property from minimum thermal conductivity
5) Lightweight, convenient to transport and handle, good for labor-saving.
6) Smooth inner walls reduce pressure loss and increase flow speed
7) Sound insulation (reduced by 40% compared to galvanized steel pipes)
8) Light colors and excellent design ensure suitability for both exposed and hidden installation
9) Recyclable, environment-friendly, accords with GBM standards

 

FAQ:

Q1:How Can I Get A Sample?

A1:You can get samples by communicate with our export sales.

Q2:How Long Is Delivery?

A2:Delivery time will be30-45days according to order quantity.

Q3:What Is The MOQ?

A3:MOQ depends on different items.

Q4:What Is Our Normal Payments Terms?

A4:Our normal payment terms now is: T/T, L/C or western union,paypal


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the common connecting methods for plastic PP pipes?
Because the hot melt connection method does not need any additional material, and can melt the connection part as a whole, achieves the body strength, the connection effect is good, therefore, here recommends the use of hot melt connection method. The use of hot-melt bonding method should pay attention to the following: first, the hot melt tool to connect the power supply, to the working temperature, the indicator light before the start of operation; II. Cutting the pipe material, you must make the surface perpendicular to the pipe axis. The general use of pipe cutting scissors or pipe cutting machine, using sharp hacksaw when necessary, but after cutting the pipe section should remove burrs; the PP pipe and pipe connection end must be clean, dry and free of grease; the welding elbow or three pass, according to the requirements of design drawings, we should pay attention to its direction in a straight direction pipe and tube, mark the location with the auxiliary mark the connection, no rotation; the end of the guide tube heating sleeve is inserted into the standard depth, at the same time, no rotating the pipe onto the heating head and reached the prescribed mark; the heating time is reached after, immediately put the pipe and pipe fittings from the heating sleeve and the heating head removed simultaneously, quickly and without rotation inserted into the standard depth, making joints form a uniform flange of the joint can be corrected, but not the rotation; to a prescribed cooling time, will The pipe cover is buckled on the pipe fittings.
Q:Antistatic flame retardant PE plastic pipe installation, what should pay attention to?
The special rubber sealing ring is coated with lubricant and put into the pipe slot, and the pipe is inserted directly into the pipe to the second mark.
Q:When calculating the installation of water supply and drainage pipelines, are elbow and pipe fittings calculated separately?
This is not necessarily, to see whether the water quota of pipe fittings, such as Fujian Province, the eighth volume of drainage pipe, plastic pipe and cast iron pipe fixed drainage pipe containing the pipe installation fee and material fee, and the rain cast iron pipe fittings with only the installation fee, material fee does not include fittings. So, when you calculate the amount of work, whether to count, according to your local quota of specific provisions, these in the quota description inside have description.
Q:Plastic pipe fittings and plastic doors and windows on the stain in what way?
They are good at this, generally do not clean up their own.
Q:What's the size of the PPR pipe?
When the connection is complete, both the pipe and the pipe must be held tightly and enough cooling time is allowed to cool down to a certain extent before the release of the pipe is continued.
Q:What are the differences between electrofusion welding, hot melt welding and welding connection?
The welding is to melt the other solder and to connect the parts, the most common are metal welding, welding plastic plates and so on.
Q:Can a plastic pipe be evacuated into two vacuum?
Yes, the polypropylene material can be made into a vacuum.
Q:The difference between PP-R aluminum pipe and PP-R pure plastic pipe
From the high temperature performance, long-term use temperature of aluminum pipe of national standard is 95. The maximum temperature is 1100 DEG C, and can fully meet the needs of the domestic water: PE pipe as the temperature increases the performance decreased rapidly, only cold water transport: long term use of PP-R national standard tube temperature is 70 degree Celsius. The highest the temperature is 95 DEG C, there are some limitations in the use of hot water tube.
Q:TTP-PESI hole net steels belt composite pipe fittings need to be taken?
Mesh steel composite plastic pipe, with cold rolled steel strip and hot plastic as raw material, using porous thin-walled steel tube argon arc butt welding molding as reinforcement, a new type of composite pressure pipe outer layer and the inner layer of the double composite thermal plastic (PESI, also known as Yum tube) to be solved, galvanized pipe is disabled, a revolutionary technology of building water supply main vertical pipe and pipe network system.
Q:The difference between the hot melt connection and connection to electricity
Cost: hot melt than electric melting time: electric melting heat, low melting fast, less than 90 of the diameter of PE pipe can only use electric connection, different manufacturers, different grades and SDR welding pipe fittings, pipes and tubes, pipes and pipe fittings, pipe fittings can only use electric melting connection

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range