Hydraulic Climbing Protection Panels for Supporting Panels

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Auto-climbing Protection Panels

The climbing protection panel is enclosure for construction of high-rise buildings.The system has  hydraulic system as its power, so it can climb up by itself. Cranes are not needed during the climbing. Thesystem can match loading platform, which is convenient for moving formwork and other materials to upper floor without disassembly.The construction efficiency will be increased highly. The climbing protection panel is an advanced, modern system which suits the demand of safety and civilization, widely used in construction. 


2. Main Features of Climbing Protection Panels

-convenient for construction 

-easy to control the quality

-easy, rapid and economical.

3. Climbing Protection Panels Images

4. Climbing Protection Panels Specifcations

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.


5.FAQ of  Climbing Protection Panels


1) What can we do for you? 

    .We can ensure the quality of the climbing protection panels and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        


2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.


3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range