High Quality Female threaded coupling.

Ref Price:
$6.60 / watt
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
1000 watt
Supply Capability:
100000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

High   Quality  Female threaded  coupling.ppr fittings HYOSUNG PPR raw materials standard:DIN8077-8078            GB/T18742.3-2002             PN25            White grey green color

1.Material:Random Polypropylene(Hyosung R200P); 
2.ISO9001&ISO14001; 
3.Standard:GB/T 18742.3-2002, DIN8077/8078; 
4.OEM also ok

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Water supply and drainage, fire pipeline installation, pipe installation has been included in the quota, if adding the elbow, three links should be the cost of materials, in which the items below?
If not, the following supplementary material quota and modify the material cost of the corresponding name, unit, quantity, unit price.
Q:What kinds of PE pipe joint
PE is the most basic plastic of polyethylene plastics, plastic bags, plastic film and so on are PE, HDPE is a high crystallinity, non-polar thermoplastic resin. The appearance of the native HDPE is milky white and is somewhat translucent in the narrow cross section. PE has excellent properties that are resistant to most life and industrial chemicals.
Q:PE is the hot melt?
1. When using this method, the hot melt butt welding machine is adopted, and the main operation steps are as follows:After the butt welding machine has been debugged, put the pipe to be placed on the welding jig and clamp;The cleaning pipe end to be connected and connected with two end milling cutter alignment docking, the displacement is not greater than the pipe wall thickness of 10%:When the temperature of the heating plate reaches the set temperature, put it on the heating plate:After heating, take out the heating plate, quickly start the oil pump pressure, join the two pipe heating surface, and step up to the welding pressure, keep pressure and cool down:After cooling to the specified time, open the clamp and remove the pipe from the rack, observe the roll edge, determine the quality of the connection, and complete the connection.2. Check the quality of hot melt butt jointThe determination of the quality of hot melt butt welding is still mainly concerned with nondestructive appearance inspection of welding roll edges. Usually includes edge geometry and cutting edge visual inspection, the edge to behind the buckling to prove that connected with no lack of fusion check.Ultrasonic testing and X ray examination have been applied abroad.Destructive detection. Tensile test, bending test and tensile creep test are carried out at the interface respectively.3, hot melt docking notes:The procedures for the use of the docking machines and the matters needing attention shall be observed;Operators must wear gloves, wear overalls, do a good job of self-protection, to avoid electric shocks or burns;Heating the surface of the board, and the connecting ends should be kept clean:Docking pressure should be adjusted to the actual needs of the site:Polyethylene pipes shall not be heated by open flame;The welding interface to protect from sand and rain hit.
Q:Are the elbow and three - pipe fittings installed in the water supply and drainage pipes included?
Indoor heating plastic pipe, aluminum-plastic composite pipe, stainless steel pipe, copper pipe installation project, the pipeline joint parts as materials, according to design drawings to determine the number and loss of 1% of the cost of materials shall be calculated separately.
Q:What tools and methods are needed for the installation of plastic hoses and steel tubes?
In some high-rise buildings, designers often need to enlarge the diameter of the pipe when they are designed, and the construction is usually done at the bottom of the riser with two pipes with the same pipe diameter as 45. Elbow connection, and then in the discharge pipe for variable diameter, often easy to change in the connection at the formation of gas plug, resulting in pipe blockage, affecting the drainage of the pipe. The correct method is to use the reducer at the bottom of the riser to enlarge and connect the elbow, and the eccentric reducer is used for the eccentric diameter, and the eccentric side is on the inner circle side of the turn.
Q:What are the common connecting methods for plastic PP pipes?
Because the hot melt connection method does not need any additional material, and can melt the connection part as a whole, achieves the body strength, the connection effect is good, therefore, here recommends the use of hot melt connection method. The use of hot-melt bonding method should pay attention to the following: first, the hot melt tool to connect the power supply, to the working temperature, the indicator light before the start of operation; II. Cutting the pipe material, you must make the surface perpendicular to the pipe axis. The general use of pipe cutting scissors or pipe cutting machine, using sharp hacksaw when necessary, but after cutting the pipe section should remove burrs; the PP pipe and pipe connection end must be clean, dry and free of grease; the welding elbow or three pass, according to the requirements of design drawings, we should pay attention to its direction in a straight direction pipe and tube, mark the location with the auxiliary mark the connection, no rotation; the end of the guide tube heating sleeve is inserted into the standard depth, at the same time, no rotating the pipe onto the heating head and reached the prescribed mark; the heating time is reached after, immediately put the pipe and pipe fittings from the heating sleeve and the heating head removed simultaneously, quickly and without rotation inserted into the standard depth, making joints form a uniform flange of the joint can be corrected, but not the rotation; to a prescribed cooling time, will The pipe cover is buckled on the pipe fittings.
Q:ABS, rubber, resin, pipe made of three kinds of material. Which kind of hardness, electricity, heat insulation is good?. Can that material be used as tubing and heating fittings?
ABS has excellent mechanical properties. It has excellent impact strength and can be used at very low temperature. ABS has excellent wear resistance and oil resistance. It can be used for bearings under medium load and speed. The thermal deformation temperature of ABS is 93~118 DEG C and can be used in the temperature range of -40~100 degrees centigrade. ABS has good electrical insulation and is almost unaffected by temperature, humidity, and frequency. It can be used in most environments.
Q:Can a plastic pipe be evacuated into two vacuum?
Yes, the polypropylene material can be made into a vacuum.
Q:As long as the quality of plastic pipe is good Can the problem of plastic pipe connection be neglected?
Must not be ignored, every step should pay attention to.Compared with the traditional metal pipe plastic pipe, one of the advantages of the connection is convenient and fast; at the same time to connect different plastic piping materials and methods are not the same, for a complete fluid pipeline system, which is composed of pipe fittings and accessories, which are connected together, as a whole, not only the requirements of each individual part such as pipes, fittings and accessories the quality meets the quality standard requirements, and the composition of the pipeline system fulfills the requirements, namely connection problems can not be ignored.
Q:Does the PPR plastic tube do any harm to your health? Is it big?
Characteristics of PPR tubes:1, as a new type of water pipe material, PPR pipe is sanitary, non-toxic, no rust, no fouling, meet the international standards for drinking water.2, high temperature resistant, high pressure resistant, heat preservation and energy saving. Small resistance, fast flow, little noise.3, light weight, toughness, impact resistance, the specific gravity is only 1/8 of the metal tube, the pressure test strength of more than 50Kg/cm2. Easy installation, reliable connection, never leak. Under normal conditions, the service life can be up to 50 years.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range