• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 011

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q:Real estate business, when to carry forward the cost?
statements and a series of information, and engineering, budget, sales, finance and other departments, the vast amount of work
Q:What is the gross margin of the real estate industry?
but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
Q:Real estate, people often say 'case' is what it means
Case security, usually property companies or real estate recruitment of security personnel, specifically responsible for a district or a property area of security w
Q:What conditions should a real estate agent have?
What is the success of the line can be easily achieved? If every list is smooth, never refused
Q:What is the real estate from the law?
Real estate because of its own characteristics that the location of the fixed and immutable, in economics, also known as real estate.
Q:What are the real estate management professions?
with a more solid economic and management theory, the system master the real estate management disciplines theory and skills
Q:What is the impact of the economic environment on real estate?
The sales of the houses depend on the purchasing power of the consumers
Q:Real estate in the "five card" which five?
transfer of land before the city planning and administrative departments to confirm the location and scope of construction projects in line with the city planning legal certificate;
Q:What is the real estate industry?
real estate intermediary services, including real estate consulting, valuation and brokerage agents, property management.
Q:The future of real estate?
From last year to the People's Day, the state introduced a series of control policies to curb the rise in prices

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products