HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--013

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What conditions should a real estate agent have?
Pressure capacity. Putting your own position, correct attitude, face the pressure, bear the challenge is every real estate agent
Q:What is the characteristics of real estate?
(C) the diversity of influencing factors. preservation and appreciation.
Q:How can we do real estate?
So to become a top sales staff, we must first learn how to maintain a positive attitude
Q:Real estate business, when to carry forward the cost?
For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit
Q:What is the land deed tax rate for real estate?
the transfer of state-owned land use right, the transfer of land use rights, including the sale
Q:What is the real estate from the law?
Real estate because of its own characteristics that the location of the fixed and immutable, in economics, also known as real estate.
Q:According to the use of housing classification?
According to the use of housing functions can be divided into eight categories:
Q:What is the meaning of the term in the real estate?
Washing dishes generally refers to the 2 hand room. A district in a break time will have owners to take their own house out to sell
Q:What does real estate mean?
Real estate refers to the land, buildings and fixed in the land, the building can not be separated from the part and its accompanying benefits.
Q:How is China's housing market trend ?
  Under the supervision of the pressure of competition and the supervision of the government

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range