Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
2000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:




The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.


If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.


2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.


4. Packing choice:


1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.


2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:


 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the land deed tax rate for real estate?
the transfer of state-owned land use right, the transfer of land use rights, including the sale
Q:What are the categories of real estate?
As the real estate is composed of land and ground buildings, structures, for land and housing can be classified according to the following methods:
Q:Kentucky is selling real estate how to understand?
KFC has always attached great importance to the geographical location of each branch
Q:What is the real estate industry?
the transfer of state-owned land use rights, real estate development and redevelopment, such as the acquisition of land, demolition resettlement
Q:What is the characteristics of real estate prices
real estate prices, including the following six points,Real estate prices have obvious price characteristics
Q:What does real estate mean?
Real estate can have three forms of existence: the land, buildings, real estate one. In the real estate auction, the auction of the subject can also have three forms of existence
Q:Real estate in the "five card" which five?
Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
Q:What is the difference between a real estate model and a real estate sand table?
as well as the project itself, the regional location information and functional division and so on. Is an indispensable sales of home sales props.
Q:Real estate business, when to carry forward the cost?
How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
Q:What is the red line in the real estate project?
The "red line" is the range boundary line.Road red line is the road boundary line (including green belt, pedestrian walkway)

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range