• GTBZ22 Self-propelled Telescopic Boom Lift System 1
GTBZ22 Self-propelled Telescopic Boom Lift

GTBZ22 Self-propelled Telescopic Boom Lift

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Self-propelled Telescopic Boom Lift

(Self-propelled Telescopic Aerial work platformGTBZ22Z):

 

MODEL                                                       

GTBZ22Z

MEASUREMENTS                      

Working height maximum 

23.9m

78ft

Platform height maximum 

22.2m

73ft

Horizontal reach maximum 

20.2m

66ft

Below ground reach 

2.93m

9ft7in

Platform length-8ft model 

0.91m

3ft

Platform length-6ft model 

0.76m

2ft

Platform width-8ft model 

2.44m

8ft

Platform width -6ft model 

1.83m

6ft

Height-stowed 

2.7m

9ft

Length-stowed 

10.69m

35ft

Width

2.49m

8ft

Wheelbase 

2.5m

8ft

Ground clearance-center 

0.43m

1ft5in

PRODUCTIVITY                                   

Lift capacity (restricted) 

480kg

1056lbs

Lift capacity (non-restricted) 

250kg

551lbs

Platform rotation 

160°

Jib rotation 

135°

Turntable Swing 

360°continuous

Turntable tailswing

1.19m

4ft

Travel speed -stowed 

6.3km/h

3.9mph

Travel speed -raised or extended 

1.3km/h

0.8mph

Gradeability -stowed (4WD/2WD)

45%/30%

Turning radius -  inside

3.0m

9ft7in

Turning radius - outside

5.2m

16ft8in

Controls 

24V DC Proportional

Solid tires

9.00-20/7.5

POWER  

Power source

 

 

Cummins B3.3NA-C60  60HP (45kw)

Lovol 1004-4 78 hp (58kw)

Perkins 400 61hp (45.5kw)

Auxiliary power unit 

24V DC

Hydraulic tank capacity 

190L

Fuel tank capacity 

150L

WEIGHT        

2WD

13140kg

28968lbs

4WD

13220kg

29145lbs

 

Q:Is the overhead hanging basket a building lifting equipment?
2, height work basket is the main wall of the building after the completion of the construction of scaffolding, but also for the old building exterior wall maintenance or decoration construction scaffolding. Height job basket technology must be manufactured and tested in accordance with national standards for GB/T19155-2003 aloft job baskets
Q:Safety management regulations for overhead operation basket
Article second of the city administrative area construction project basket rental, installation, disassembly, use, management, apply to these provisions. Third XXX city construction project quality and safety supervision station is responsible for the city's supervision of the project basket management. The construction quality supervision station of the construction project shall be responsible for supervision and administration of the hanging basket of the supervised project within its jurisdiction.
Q:The ratio of the maximum overturning moment of the overturning moment and the rated load capacity of the suspension platform to the center of the overhang of the suspension platform shall not be less than that of the suspension platform
Electric basket requirements: structural safety factor. 2 the basket brake must make the suspension platform with dynamic test load stop running within the braking distance of no more than 100 mm. 3, the basket must be installed on the upper limit device. Each of the 4 basket hanging point must be set to 2 wire ropes, must be independent of a safety device safety lock or the same function of wire rope. During normal operation, the safety rope should be smoothly through the independent safety device safety lock or the same effect.
Q:What does "hanging basket" mean in the stock market?
When the stock market is the board, investors are not allowed to eat because of the market outlook, "may be under low and low price, then investors can be first in the vicinity of the first bounce point with a small amount of funds for exploratory buying, such as being locked does not matter, and then observe the second times and third times the price rebound after the fall, under the the shadow value after the quilt (lowest) at the low price of 0.5-1 yuan basket head. If you can't always buy it (within a week), it means that the value of the commission you are calling is already at the bottom. If you entrust the price, a commission can buy, indicating that it is still not the bottom, the stock price will fall. So astute investors, on the trend of uncertainty, often using super cheap to buy, one or two times or even several times, repeatedly proven at the bottom position, easy to buy, so as to reduce the costs and reduce the risk to the quilt.
Q:What kind of aptitude does ZLp overhead job basket use?
Two, basket mounting qualification (such as: lifting machinery qualification three or more, ABC, three categories, security, construction, electricians and other personnel, etc.)
Q:How to use the hanging basket properly and up and down normally, speed and anti tilt
Pay attention to the phenomenon of wire rope sticking of hoist. In the electric hoist lifting basket Rieter work before, we must be fully prepared to work, to avoid the risk of accidents, while also ensuring the timely completion of the work.
Q:When will the manual lifting cradle be used?
Hanging scaffold rod is set on the roof, walls out of not less than 1500, set in wire rope out of the bar, the rope hanging scaffold or basket, lifting means manual and electric hoist lifting.
Q:What kind of hanging basket can be used for exterior wall construction?
Hanging basket is the construction machinery of aerial work in construction engineering. It acts on the curtain wall installation and the outer wall cleaning. Now in the root furnace testing, hanging basket, bridge with long hanging basket, elevator installation basket, track type sliding basket, etc.
Q:How many kinds of basket are there?
Now there are some special buildings Rieter construction basket basket, for example: L type, U type, round type, fan type etc.. Special-shaped building basket needs professional customization.
Q:How to transplant basket?
There is no soil transplant is not a problem, the problem is that after transplanting soil, must be compacted. Don't leave any space. Water it for the first time.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords