ZLP500 Exterior Wall / Window Cleaning Platform Cradle Scaffolding 4M 500KG 1.5KW

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ZLP500 Exterior Wall / Window Cleaning Platform Cradle Scaffolding 4M 500KG 1.5KW

1) Quick Detail:

1. Model No.: ZLP800

2. Brand Name: HAOKE

3. Material: Steel / Aluminum

4. Appearance: Plastic Spray Painted / Hot Galvanized

5. Capacity Loading: 800 KG

6. Lifting Height: Maximum 300 Mts

 

2) Applications:

1.Cleaning and maintaining of the exterior wall of high-rise building.

2.Painting, decoration and refurbishing of exterior walls.

3. Installation projects and other construction working of outer walls of high-rise building.

4. Aerial working of ship, large tower, bridge, dams and large chimneys.

5. Install and maintain for high-rise building elevator hoistway, shipbuilding industry, seagoing vessel, warships weldingmaintain.

 

3) Specifications:

Model No.ZLP800
Rated load(kg)800
Lifting speed(m/min)8~10
Motor power(kw)2×1.8 50HZ/60HZ
Brake torque(Km)16
Steel rope angle adjusting range(°)3°- 8°
Distance between two steel rope(mm)≤100
Rated stretch of front beam(mm)1500
Suspending PlatformLockingAluminum alloy
Nr.Of platform rackSingle rack
Nr.Of platform3
L×W×H(mm)(2500×3)×690×1300
Weight(kg)410 Kg
Suspending mechanism(kg)2×175 Kg
Counterweight(kg) optional25×40pcs
Diameter of steel rope(mm)8.6
Max Lifting height(m)300
Motor rotation speed(r/min)1420
Voltage(v) 3PHASES220V/380V/415V (customized)

4) Competitive advantages:

1.Absolutely guarantee life safety during Aerial working

Safety lock fasten the steel rope immediately once the suspended platform tilts or the steel rope slips out of the hoist;

Electric control system is designed with leakage protection, over-heat protection, current overload protection and brake stop;

Good-quality steel wire rope, safety rope and cable.

2. Stable performance: raise up and lower down smoothly

3. Modular design. Easy to disassemble, assemble operate and maintain.

4. Lifting height can be adjusted according to requirement (Maximum 300 Meters)

5. Working voltage and frequency can be adjusted (220V/380V/415V etc.)

6. Suspended platform for special usage can be customized (circular, L shape, U shape, etc)

7. Professional quality, competitive price, fast delivery, good services.

5) Parts of suspended scaffold platform:

 

1. Platform(basket): Steel or Aluminum Alloy (painted or hot galvanized)

2. Suspension Mechanism: Steel (painted or hot galvanized)

3. Electric hoists:LTD6.3 or LTD8

4. Safety Lock: LST30

5. Electric control box: Along with hoists

6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm

7. Safety rope: 18mm,20mm

8. Electric cable: 3*2.5+2*1.5

9. Counterweights: Cement , cement with steel cover & Iron counterweight

10. Spare parts

 

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which is better?
We also specialize in curtain wall glass, used Hebei basket more, but the quality is relatively poor, and later also purchased in Wuxi, the quality is slightly better, this year the company business, is also high on the basket on Chengdu, the boss of my friends to help us said there is a company called Foshan Senmao machinery equipment leasing company a very good quality customer service or service we have been in use, you can have the opportunity to try to have their information online,
Q:Calculation of engineering quantity of electric hanging basket
According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
Q:Hanging basket operation 'Ten' is not allowed
5., not allowed to use the hanging basket in foggy weather, l 6. is not allowed in a basket across another basket for homework; 7., no hanging basket, sick homework;
Q:Construction basket for hanging basket
Suspension platform: suspension platform is the working area of construction personnel. He is composed of high and low railings, basket bottom and hoist mounting frame. The four parts are assembled by bolts
Q:Who knows the construction basket reported those information?
2. basket installation and removal of the construction project; 3. basket construction tests; testing issued by 4. with relevant qualification certificate by a third party testing unit certificates; 5. basket construction inspection records and test certificate and report form and so on;
Q:What are the basic components of the overhead hanging basket?
Gondola structure: the structure is divided into three parts: suspension platform, wire rope, sling suspension platform containing platform, elevator, safety lock and limit switch, the control box containing suspension frame, weight lifter
Q:Construction; basket; detection proportion
However, the supervision of different places is different, because the height of the operation basket is not long, and some areas do not attach importance to the detection of the hanging basket at high altitude, and have not received the inspection and acceptance in time. From the provisions and personal safety considerations, should be timely organization, testing and acceptance. There are testing units for mechanical testing, qualified to put into use, and reduce security risks. Simply put, after testing and then put into use, in case of accidents, supervision units and construction units will be much smaller responsibility.
Q:What is a bridge gondola?
A bridge basket is an electric basket. Just this kind of gondola is specially made. Can only be used in the bridge bridge this basket for specific purposes 1, Rieter bridge repair, maintenance and construction of foreign countries in the bridge repair and maintenance and construction has been widely used in recent years the domestic electric car, such as Shanghai, Jiangyin Nanpu Bridge, Yangtze River bridge also began to use.
Q:Request a basket construction quota
General calculation method: (1) according to the construction organization design, the selected number using basket basket, determine the shift number according to the construction period, select the unit according to the market rental price execution. (2) if there is no construction organization design, should be selected according to the number of actual basket, on the basis of the construction team to determine the number of single diary or visa
Q:What are the specifications associated with the gondola?
Winter construction personnel must wear non slip shoes and trousers, cotton insulation, will dress up and fasten the trouser cuffs. The above is the use of this standard seasonal Rieter basket

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range