Flat 3 Wires Rice Light
- Loading Port:
- Ningbo
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 1000 Meters set
- Supply Capability:
- 20000 Meters set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
General Introduction
Flat 3 Wires Rice Light
Specification
Model No. | DG-F3 | Type | Flat 3 Wires |
Coating | PVC | Life | 8000 hours |
Diameter | 11*17mm/11*16mm/10*14.5mm | LED QTY | 50, 60, 72 bulbs/m |
Voltage | 12V/24V/120V/240V | Color | Customized |
1. Color Available: ww, white, red, yellow, blue, green, orange, purple, pink , multicolor 2. Different Sizes Available 3. Suitable for both indoor and outdoor use 4. Waterproof: IP20 or IP44
|
Brief Introduction:
Flat 3 wires rope light is chasing rope light. Chasing rope lights give the appearance of movement (chasing) by alternating circuits.
The more wires (up to 5) the more circuits you have resulting in better chasing effects. All chasing rope lights require a controller.
Customers prefer to choose big packing 40m-100m in plastic reel then in master carton and they usually buy the accessories or controller together.
Main Feature:
1. Energy Saving: saving 90% energy more than incandescent lamp under the same power
2. Long Life: more than 30,0000 hours lifetime, 5-10times more than normal lamp
3. Low heat emitting: solid light source and resiniferous package to make low heat
4. Eco-friendly: no splash and UV, without mercury and no damage to human and environment
5. High display: clear view and color display to give real image for objects
6. Anti-damage: space aluminum material to protect it from damage during shipping
Technical Data:
ITEM NO. | LENGTH | BULBS/M | VOLTAGE | DIAMETER | LIFETIME | |
DG-F3-10m | 10M | 50L,60L,72L | 110V/220V | 11*17mm/11*16mm/10*14.5mm | 8000H | |
DG-F3-50m | 50M | 50L,60L,72L | 110V/220V | 11*17mm/11*16mm/10*14.5mm | 8000H | |
DG-F3-100m | 100M | 50L,60L,72L | 110V/220V | 11*17mm/11*16mm/10*14.5mm | 8000H |
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
By sea | 30-40 business days |
1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address.
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q:Building lighting in lighting, lighting should pay attention to what details?
- Like the direction of lighting, we should design a particular direction as the main direction of view in the design.
- Q:What lamps or lighting energy-saving schemes are available for underground parking?
- I think you can go to Shenzhen Rui Rui look
- Q:What are some good suggestions for plant energy saving lighting modification?
- the theory of life can reach 50000 hours, to the factory lighting energy saving renovation has brought great benefit.
- Q:The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
- the lighting voltage is 220V, 10 "12V, 10W" series connected to the lighting circuit,
- Q:About the brightness of LED lighting
- The first is the internal circuit problem. 1 Section 7 should use constant current drive circuit.
- Q:How much does LED lighting save more than regular lighting?
- I see the circuit design of high voltage LED driver for some people, he is not with the step-down switching regulator, but with the series resistance buck, such a scheme can not take advantage of the LED is LED to save power and waste on resistance in series,
- Q:The problem of intelligent lighting control
- You can use this loop design as you say. It may be inflexible and how to switch. Is it an artificial control switch? The circuit loop design is too complex, and there are some problems in the subsequent transformation and maintenance
- Q:What is lighting energy-saving?
- Lighting comes mainly from light energy converted from electric energy, which comes from the burning of fossil fuels.
- Q:Jiaxing Shenghui lighting treatment?
- 3 holiday benefits (generally 4, development space is generally stingy)
- Q:What are the main technical measures for the implementation of energy-saving lighting?
- The most basic principle is that different light sources should be chosen according to different places.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Flat 3 Wires Rice Light
- Loading Port:
- Ningbo
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 1000 Meters set
- Supply Capability:
- 20000 Meters set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords