Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery pipe connection. 
Our concrete pump pipes have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc.



Main Product Features:

1. Mainly adopt carbon steel high wear resistant steel, and other material upon your request.

2. Service life:7000-80000 CBM Concrete.

3. The inner side of this concrete pump pipe can undergoes heat treatment, and then the hardness can reach 63HRC.

4. Possess quality certification of ISO 9001:2000. Can pass CE test.

5. A wide range of specifications for you.

6. We can supply OEM service and can also produce according to your requirements.

7. Total series of concrete pump pipes for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc) available from us.


Product Specifications:

Dimension: DN125

Length: 6m

Thickness: 4.5mm

Material: ST52

Weight: 83kg

Characteristics: without flange

Package: Seaworthy packing or as customers’ request.


FAQ:

Q1: How to confirm that your pipes could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of pipe in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52




Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52



Other Products  :


Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the skills of concrete pump?
In the process of pumping concrete, with the increase of pump pressure, pump impact force will force the tube to move back and forth, this is not only the loss of pumping pressure, and connecting parts between the pump in shock and intermittent tension state, can lead to premature damage, and rubber pipe cement slurry overflow, therefore must be fixed the pump
Q:How can the concrete pump pipe be cleaned?
The pipeline shall be provided with a stop valve, and the stop plate shall be inserted to prevent the vertical or upward tilting of the concrete in the pipe
Q:How much is the pump for a month?
Depends on you are a big pump, small pump, and now about 0.7 of the fuel consumption, and you do a month how much work, generally, if you do 10000 square a month, then two years to recover costs
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Day pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to completeDay pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to complete
Q:What is the first generation pumping technology of concrete pump?
Electronically controlled reversing technology, PLC control solenoid valve reversing to achieve the pump, S pipe distribution of alternating direction
Q:How is the piping of the concrete pipe designed?
Vertical upward piping, the ground level pipe length shall not be less than 1/4 of the vertical pipe length, and shall not be less than 15m, or comply with the provisions of the product manual. A stop valve shall be provided at the root of the conveying pipe of the concrete pump Y - shaped pipe discharge port 3 - 6m, so as to prevent the concrete mixture from flowing back
Q:What is the name of the pump for concrete transportation?
Concrete pump truck is modified on truck chassis. It is equipped with motion and power transmission device, pumping and mixing device, cloth device and other auxiliary devices on the chassis.
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
Pour the grout into the hopper, turn the pump in and out again and again, forcing the passage to open
Q:What are the precautions for gas washing of concrete pump?
Subsection blowing, should first blow off near the discharge end of a pipe, then has blown the empty tubes connected with not purged during the purge, the remaining part.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range