Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery pipe connection. 
Our concrete pump pipes have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc.



Main Product Features:

1. Mainly adopt carbon steel high wear resistant steel, and other material upon your request.

2. Service life:7000-80000 CBM Concrete.

3. The inner side of this concrete pump pipe can undergoes heat treatment, and then the hardness can reach 63HRC.

4. Possess quality certification of ISO 9001:2000. Can pass CE test.

5. A wide range of specifications for you.

6. We can supply OEM service and can also produce according to your requirements.

7. Total series of concrete pump pipes for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc) available from us.


Product Specifications:

Dimension: DN125

Length: 6m

Thickness: 4.5mm

Material: ST52

Weight: 83kg

Characteristics: without flange

Package: Seaworthy packing or as customers’ request.


FAQ:

Q1: How to confirm that your pipes could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of pipe in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52




Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52



Other Products  :


Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52

Concrete Pump Truck Parts Delivery Pipe without flange DN125 6MTR Thick 4.5MM ST52


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the power of concrete pump motor
The construction of concrete pump truck has more adaptability and flexibility, boom height, pouring height and cloth radius is bigger, stronger adaptability to construction, in the construction should choose the high concrete pump boom. The concrete pump truck with boom length 28~36m is a large and wide range of products in the market, and about 75%. long arm concrete pump will be the main type of construction. In addition, the concrete pump truck is limited by the automobile chassis capacity. When the boom height exceeds 42m, the cost increases greatly, and it is limited by the space of the construction site, so it is rarely used.
Q:What is the second generation pumping technology of concrete pump?
The whole hydraulic control technology delivery pump has no constant pressure pump, no PLC in the control box, no nitrogen gas storage tank and no close switch at the water tank. The structure is simple, and the maintenance cost is greatly reduced.
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
If this method does not dare, it can only be manually removed, remove the connecting pipe, remove the debris in the valve.
Q:How much is the pump for a month?
Remove the pump car monthly fuel maintenance consumption (about 10 thousand to 5000), calculate the monthly one of the clay, probably earn about 14 to 150 thousand net!
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
The length of day pump 36-62m, the efficiency has little effect, regular work is generally 30-40 cubic / hour
Q:What are the types, classifications and specifications of concrete pump?
In accordance with the export pressure rating label, divided into low pressure pump (5MPa), medium pressure and high pressure pump pump (6-10MPs) (>10MPa)
Q:How to choose concrete pump?
The actual export pressure of concrete pump and the actual product per hour, the greater the value, the greater the capacity index, the power of the motor will be greater, thus achieving the purpose of large displacement, high lift
Q:If the concrete pump valve jam how to judge and deal with?
The valve plug is formed gradually, the main reason is that after the completion of concrete pump, no time to use high-pressure water washing, resulting in concrete residue in the tube after a considerable period of time, gradually thickening, accumulation of consolidation, resulting in congestion.
Q:What are the causes of pipe blockage in concrete pump?
The concrete mixture ratio of adverse pressure gradient in the relatively large, water will be through the aggregate gap penetration, the aggregate coalescence caused by plugging occurred in the pipeline, and the pipeline bending diameter hose is arranged in the middle; in addition, concrete water cement ratio is too large to cause the separation of mortar and aggregate segregation, and plugging
Q:Which is the best home made concrete pump car?
The first line is 31 and Zhonglian, the price is expensive, the car is big, the problem is not, and there are many small problems

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range