Cable Tray Z80

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5ton m
Supply Capability:
10000 ton/year m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cable Tray, Perforated Cable Tray, stainless steel cabletray of Cable Tray Z80

 Perforated cable trays have three load carrying capabilities: Heavy Duty Return Flange, Medium Duty Return Flange and Light Duty. 

Features of Cable Tray Z80

-- Increase the current carrying capacity of cables

-- Takes up to 25 percent less space than ladder

-- Hole pattern designed to provide maximum flexibility for positioning cable ties

-- Speed of installation

Specification of Cable Tray Z80

-- Thickness: 0.5 mm - 2.0 mm (22 - 27 Gauge)

-- Height: 15 mm - 75 mm (Light, Medium, Heavy Duty)

-- Width: 50 mm - 900 mm

-- Length: 2-6M (can be produced according to appointed length)

-- Finished: Pre-galvanized (Z80 - Z275), hot dipped galvanized, power coating

Range

Height

Width

Thickness

Light Duty Cable Tray

15-20

50 - 900

0.8 – 2.0

Medium Duty Cable Tray

25

50 - 900

1.0-2.0

Heavy Duty Cable Tray

≥35

50 - 900

1.0-2.0

Other Shapes & Sizes Are Available Upon Request.

 Cable Tray Z80

 Cable Tray Z80

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why this cable has not yet been certified
Electromechanical products are usually used to be assembled into parts, multiple parts and then assembled into a single product, the number of products or the number of pieces measured
Q:Galvanized wire tube buried to do anti - corrosion do
No need. Galvanized flat iron to do when the grounding grid is not anti-corrosion, but if there is welding or damaged place to become anti-corrosion.
Q:Where should the inner diameter of the plastic tube of the cable be at least the number of times the outer diameter of the cable?
Wiring room refers to the distribution of the weak floor of the room, the weak point refers to the building weak vertical pipe
Q:Wire printed on the word what way to erase
Wipe with water that day. You can also use ink thinner
Q:What kind of KVM switch is this configuration below?
Direct selection of reton's 32-port digital KVM, model is: KS-2032C. Fast transmission, wiring is simple. Want to know the price to ask their website on it.
Q:Automotive wiring harness welding to pay attention to what the problem
Sometimes no way, the problem to the owners to solve the common, must wear, the owners agreed
Q:Is there a difference between PE cable and PE water supply pipe?
Labor costs you can and workers to discuss, and some labor costs are calculated in accordance with square meters, and some are calculated in accordance with the day, the specific or ask the local construction team
Q:How to distinguish between power cables and electrical wiring on drawings
Can not be removed, and so on after the first line of fluoride, and then demolition of air conditioning.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:Cable YJV-3 * 70 + 2 * 35 general wear large SC tube? Ask you.
I use the TV as a computer screen, connect the HD line, how no sound
We are the professional manufacturer of cableholder. We always take a high quality concept as the core technology, insist on honesty, hard and serious work, and constantly improve our own strengths. By always putting the quality at the first place, we train a large number of professional personnel, to produce high-quality products and services

1. Manufacturer Overview

Location Shandong,China
Year Established 2001
Annual Output Value Above US$150 Million
Main Markets Mid East;Western Europe;North America,South Asia
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Qingdao
Export Percentage 90%
No.of Employees in Trade Department 30 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above 150,000 square meters
No. of Production Lines Above 5
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average