Cable Accessories Separable Connector Plug

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

RU 200 A 15, 25, and 35 kV Loadbreak Elbow Connectors and Accessories are submersible, fully-shielded and insulated plug-in terminations, ideal for connecting underground cable to transformes, switchgear, sectionalizing cabinets and junctions. These connectors are molded using high-quality, peroxide-cured EPDM insulation for reliable field performance.

15 kV and 25 kV loadbreak elbows are available with an integral jacket seal for use with concentric neutral and other types of shielded cables.

All 200 A loadbreak connectors meet the electrical, mechanical, and dimensional requirements of IEEE Std 386™ standard and are designed to be fully interchangeable with other major manufacturers currently complying with IEEE Std 386™ standard.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is there a difference between PE cable and PE water supply pipe?
Labor costs you can and workers to discuss, and some labor costs are calculated in accordance with square meters, and some are calculated in accordance with the day, the specific or ask the local construction team
Q:Automotive wiring harness welding to pay attention to what the problem
When the lighting circuit and the power circuit shared ladder, BV line is not allowed to put in the ladder, so it is recommended to use the wiring of the lamp ZC-YJV-3 * 2
Q:What is the current good computer configuration on the market? The price of 4000 yuan or so no more than 4000 assembly parts to write down the price Thank you.
No way to save money! Moreover, the signal to you there, almost all attenuation finished.
Q:Cable YJV-3 * 70 + 2 * 35 general wear large SC tube? Ask you.
I use the TV as a computer screen, connect the HD line, how no sound
Q:What is the difference between a trunking and a bridge in a weak construction?
Power circuit box, the home of the circuit is divided into lighting, walls, air conditioning, etc., there is the bathroom and the kitchen line and the separation of the room.
Q:What does the letter of the computer cable model mean?
Cable regardless of the definition of the number of elements in the definition of a few such as: YJV-3 * 50 + 1 * 16 calculated the number of lines is always a different, different wire rules Model input: bv-2 * 2.5 / bv-3 * 4 (different material), bv-2 * 2.5 + 3 * 4 (the same material)
Q:Where should the inner diameter of the plastic tube of the cable be at least the number of times the outer diameter of the cable?
Wiring room refers to the distribution of the weak floor of the room, the weak point refers to the building weak vertical pipe
Q:The computer can not open the machine display frequency beyond the scope of the mouse and keyboard do not start can not press F8 how to do
According to the "Power Engineering Cable Design Code" GB-. 5.3.3 only asked for the depth of the cable buried directly: drop the blue skin to the ground depth, not less than 0.7 meters; when located in the roadway or farmland Under the appropriate should be deepened, and should not be less than 1.0 meters. 5.4.3 protected pipe buried in the ground, should meet the requirements under the depth of the pressure and environmental corrosion resistance. Through the uneven settlement of the backfill section and other places to increase the force, it is appropriate to use steel. Another direct burial should be selected armor type.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:Home leaked, installed in the floor below the wire was blisters will have any security risks? How can the water inside the pipe to dry
Megohmmeter, such as measuring insulation normal, that is, induction power, the other line after grounding, the pen measured no electricity.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range