Biggest HVAC Flexible Hose Factory Flexible Duct Factory

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
200 PCS
Supply Capability:
100000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Features and Characters of Aluminium Flexible Duct ing:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature



Description of Aluminium Flexible Ducting

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building. 

Specification of Aluminium Flexible Ducting:

Non-insulated Flexible Duct: Structure: Two-layer aluminum foils +1 layer of PET film.

Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool  Outer jacket: 1 layer of Alu. foil  Glass Wool Density: 16kg/m3; Thickness: 25mm

 

Pictures of Flexible Ducting:

Biggest HVAC Flexible Hose Factory Flexible Duct Factory

Biggest HVAC Flexible Hose Factory Flexible Duct Factory

 

FAQ of Aluminium Flexible Ducting:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Can be small, according to your roof to do what material.
Q:What is the whole heat exchange fresh air ventilator?
Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q:Space blowing wind is not cold how is it?
The general level of more than 12 layers when you need to use.
Q:HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Q:Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q:Single cold air conditioning function can not change the cold and warm?
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q:The United States direct mail dyson hp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range