Uninsulated Aluminum Flexible Duct

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
200000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ventilated Flexible Duct For HVAC For Ventilation & Refrigeration

 

1.Structure of Aluminum Flexible Duct for Ventilation & Refrigeration

Aluminum Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible, it is easy to run  around and through obstacles in the building.

Flexible Duct Usage:

1. Ventilation system, Extraction of solvents, Extraction of corrosive gas and fumes

2. Low pressure application, Transfer of hot and cold air, Air conditioning

3. Vehicle construction, Engine construction, Exhaust fumes extraction

2.Main Features of Aluminum Flexible Duct for Ventilation & Refrigeration

1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting

2. Highly flexible

3. Excellent resistance to chemicals

4. Small bending radius

3. Aluminum Flexible Duct for Ventilation & Refrigeration Images

 

Ventilated Flexible Duct For HVAC

4. Aluminum Flexible Duct for Ventilation & Refrigeration Specification

PROPERTIES

VALUE

DIARANGEMETER

80~1200MM(3”~48’’)

TEMPERATURE RANGE

-30~+250

VELOCITY OF AIR FLOW (MAX)

20 m/s

WORKING PRESSURE

2500 Pa

BENDING RADIUS

0.54*D

STANDARD LENGTH

7.6M OR 10M

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

 ①What’s the Application for the products?

Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run  around and through obstacles in the building.

     What’s the Advantages for the products?

              No need special tools for cutting

  In case of fire no toxic gas are emitted

The product have been successfully tested for fire resistance

Can be bent in any direction

     How long can we receive the product after purchase?

In the purchase of product within two working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q:External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:The United States direct mail dyson hp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Decoration refers to the home improvement part, housing construction is the content of the building
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range