• BF3500 MULTI-FUNCTION HAND PALLET TRUCK System 1
BF3500 MULTI-FUNCTION HAND PALLET TRUCK

BF3500 MULTI-FUNCTION HAND PALLET TRUCK

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing












Q:What is a forklift? Forklifts are special equipment
Forklift truck is an industrial transport vehicle, which is a variety of wheeled transport vehicles for loading and unloading, stacking and short-range transportation. International standardization organization ISO/TC110 is called an industrial vehicle. Often used for the transportation of large items in storage, usually with a fuel engine or battery. It's a special equipment.
Q:Urgent, please go to logistics expert, the question about the warehouse
Can put the goods of a few higher. Our company is such a place, a lot more than before, and also not easy be affected with damp be affected with damp. Totally can use this way.
Q:What is the relevant content of the flow of materials, storage and usage
Unitized packaging and standardization is the foundation of the enterprise logistics work, for the protection of the components, the follow-up of logistics planning and the determination of through put play a key role. Adopt the reasonable unitized equipment, can reduce the invalid labor (such as inversion, not fall to the ground) in the process of machining, improve labor efficiency, simplify the site management, reduce the security hidden danger. The idea of packaging unitization and standardization is controlled mainly from macro and micro level. On the macro level, we need to set the size chain for all materials from the perspective of the supply chain. From the tray to the turntable, the special frame should be coupled with this dimension chain. On the micro level. In order to meet the basic requirements of packaging design, such as the principle of protecting spare parts and saving space, choose the proper packaging materials, internal separation materials and so on. At the same time, the loading number of the packaging unit should be fixed so as to reduce the statistical workload of the on-site staff. Some factories have higher management requirements for packaging and line workstations, which require the packaging to be incorporated into the day-to-day management of the process. For packaging, cleaning, cleaning (cleaning oil, labeling, etc.), repair, storage, etc.
Q:What are the potential defects of the automated material handling system?
Stacker crane Automatic stacker crane is a machine, electrical integration of high-tech products, products mainly to the (box, bag, barrel), through a continuous mechanical action, according to certain order stack to the corresponding empty tray, to facilitate the batch product handling and transportation, so as to improve the efficiency of the production. According to the height of the entry, different stacker machine is divided into high and low stack.
Q:What is the rational and scientific classification of logistics facilities and equipment
Facilities: like warehouses, roads, public parking lots and so on. Equipment: vehicles, pallets, forklifts, RF scanners, GPS locators, and so on. Large and long-term use and investment, not easy to move and sell are facilities.
Q:Why should we emphasize unitization and standardization in material handling
Reducing the degree of climate impact, ensuring normal work, accelerating the flow of goods and improving efficiency. 1) logistics base module The logistics base modulus is the minimum size of the standard size of the logistics system. In basic module size was determined, the size of the various specific standards, should be based on basic module size, select the integer times to the prescribed standards for size, foundation modulus size is determined, just a standard size in multiple choice, it can be used as a standard of other size.
Q:Talk about how to cut the cost of moving materials.
Cost direct costs and indirect costs. Direct costs are inputs and manpower.I hope my answer will help you
Q:The material needs to be transported, it is easy to produce dust.
We're doing the granule engineering, and we can talk about this: First: the properties of material itself, temperature, contact material, ability, distance and so on The second: the material that produces dust easily, the simplest principle is relatively close, ideal method is low speed of course. Third: as far as you are going to be able to transport it, you will have to sit down and discuss it
Q:What are the requirements for the science of loading and unloading
Reduce the load ratio of the mobile carrying equipment. To optimize the utilization rate of transportation equipment and manpower. Plan all the equipment to be maintained and maintained regularly. When there are more efficient means of handling and equipment, it should replace obsolete methods and equipment.
Q:What is the material handling and handling equipment?
?The shelf storage system Pallet racking | cantilevered shelves shelves | | gravity type rotary rack | pick racking system 4. Automated multi-layered storehouse stacker | | stacking robot horizontal rotary automatic vertical type rotary library | automatic library | tray type automatic library 5. Cold chain equipment Refrigerator car | | cooler cold box | | 6. Other refrigerator storage site finishing equipment workshop equipment | turnover box | flexible bar | | plastic cage car truck 7. Bar code identification system data acquisition equipment | radio frequency identification (RFID) system | data terminals

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products